Community Budget Issue Requests for 2007 - 2008
Line # Tracking # Originating
Sponsor
Request Title Requested Amount
1 765 Alexander Alternative Certification Program 417,870
2 713 Alexander Canal Point Sanitary Sewer Expansion 600,000
3 2127 Alexander City of Frostproof Wastewater System Improvements 7,178,500
4 2955 Alexander City of Okeechobee Canal Clean-Up Project 150,000
5 2952 Alexander City of Okeechobee Commerce Center Water Retention Installation 300,000
6 2953 Alexander City of Okeechobee Emergency Radio System 450,000
7 2951 Alexander City of Okeechobee Stormwater Improvements 1,000,000
8 472 Alexander City of Wauchula Drinking Water System Improvements 2,550,000
9 464 Alexander City of Wauchula Electric Substation Rehabilitation 1,125,000
10 2287 Alexander City of Wauchula Wastewater Treatment and Reuse Improvements 8,510,078
11 698 Alexander Crooked, Clinch, Reedy Regional Flood Mitigation 1,000,000
12 489 Alexander Electronic Health Records (E.H.R.) 500,000
13 3088 Alexander Emergency 30 Bed Children's Crisis Unit 5,000,000
14 3399 Alexander Family Emergency Treatment Center 1,500,000
15 115 Alexander Florida FFA Leadership Training Center 1,500,000
16 4055 Alexander Florida Initiative for the Advancement of Teaching (FIAT) 3,188,320
17 2894 Alexander Florida Institute for Sustainable Energy (FISE) 4,912,868
18 2607 Alexander Frostproof Care Center 157,500
19 660 Alexander Glades County Sewer System Expansion 1,425,000
20 662 Alexander Glades County Youth Livestock Rodeo Arena Repair/Renovation 850,000
21 1975 Alexander Haines City Public Health Clinic 6,779,300
22 118 Alexander Hardee County Bowling Green/Vandolah Wastewater Services 1,200,000
23 120 Alexander Hardee County Fairground Cattleman's Arena 750,000
24 178 Alexander Hardee County Regional Wastewater Service 2,285,000
25 119 Alexander Hardee County Zolfo Springs Joint Police/Fire Station 650,000
26 121 Alexander Hardee Small County Courthouse 500,000
27 484 Alexander Highlands County Agriculture Convention Center 2,000,000
28 3624 Alexander Lake Okeechobee Projects (LOER & LOPP initiatives) 6,200,000
29 477 Alexander Lake Placid High School Wind Retrofit 1,650,000
30 538 Alexander Lake Placid Ridge Community Center 4,030,000
31 689 Alexander Lake Wales Public Health Clinic 5,720,570
32 3967 Alexander Lake Wales Recreation and Cultural Complex 1,000,000
33 661 Alexander Moore Haven Stormwater Retrofit Project 300,000
34 710 Alexander Okeechobee Community Health Center 3,000,000
35 707 Alexander Okeechobee County Emergency Operations Center 4,000,000
36 706 Alexander Okeechobee County Multi-Use Shelter 3,000,000
37 709 Alexander Okeechobee County Stormwater Pump Conveyance System 750,000
38 712 Alexander Okeechobee County Wastewater Expansion and Improvements 1,800,000
39 711 Alexander Okeechobee Emergency Raw Water Supply Pumping 300,000
40 708 Alexander Okeechobee Small County Courthouse 500,000
41 758 Alexander Polk County Agriculture Center 584,551
42 1272 Alexander Polk County Association for Handicapped Citizens, Inc. Education and Vocational Traning Center 2,000,000
43 749 Alexander Redefining the Rural High School (HEC) 498,804
44 539 Alexander Ridge Lakes 250,000
45 1718 Alexander Sewer System Line Extension 328,750
46 2149 Alexander St. Lucie County Airport 3,000,000
47 1950 Alexander St. Lucie River Issues Team 5,709,627
48 463 Alexander Town Water Plant Replacement 2,000,000
49 3221 Alexander Treasure Coast Education and Research Center 4,000,000
50 334 Alexander Upper Peace Watershed Restoration Initiative 10,000,000
51 2193 Alexander Water Plant Improvements 3,000,000
52 1296 Argenziano Agricultural Complex HVAC installation. 320,000
53 814 Argenziano Baker County Wellfield 450,000
54 241 Argenziano Blind Americans, Inc./Wishing Well Center 93,200
55 1345 Argenziano Branford Rodeo Arena Complex 268,000
56 1123 Argenziano Bridge Replacement (340010) 1,250,000
57 1127 Argenziano Bridge Replacement (340011) 1,100,000
58 1128 Argenziano Bridge Replacement (340014) 2,250,000
59 34 Argenziano CINS/FINS Part-time Nurse for Youth Crisis Shelters 1,055,600
60 2813 Argenziano CR 357 South Paving 990,000
61 461 Argenziano Citrus County Fairgrounds Improvement Project -- Phase II 1,500,000
62 1619 Argenziano Citrus County Master Stormwater Drainage Plan 1,000,000
63 915 Argenziano City of Live Oak Drinking Water Improvements Project 1,000,000
64 906 Argenziano City of Live Oak Public Access Wastewater ReUse Project 1,000,000
65 113 Argenziano City of Macclenny Waste Water Treatment Upgrades 950,000
66 252 Argenziano Columbia County Civic Center 4,000,000
67 984 Argenziano Columbia County Courthouse Security 70,000
68 1221 Argenziano Council on Aging Expansion 300,000
69 1716 Argenziano Davis Lake Restoration Project 5,000,000
70 1286 Argenziano Dixie County  -  Jena Wastewater 8,000,000
71 1629 Argenziano Dixie County - Jena Water Improvements 5,000,000
72 2576 Argenziano Dixie County Agricultural Pavilion 460,000
73 1830 Argenziano Dixie County Courthouse Renovations 200,000
74 2716 Argenziano Dixie County District 3 Community Center 400,000
75 156 Argenziano Dunnellon Public Library- New Construction 500,000
76 38 Argenziano Dunnellon Stormwater Management System Improvement 450,000
77 1843 Argenziano Dunnellon Wastewater System Improvement 6,794,653
78 35 Argenziano Dunnellon Water System Improvements 550,000
79 3 Argenziano Emergency Shelter in White Springs 300,000
80 244 Argenziano First Federal Sportsplex Improvement 200,000
81 830 Argenziano Forest Capital Hall 500,000
82 914 Argenziano Hale Park Renovation 2006 200,000
83 13 Argenziano Hamilton County Arena Cover 265,000
84 15 Argenziano Hamilton County Courthouse Renovations 250,000
85 7 Argenziano Hamilton County Veterans Memorial Park 253,150
86 911 Argenziano Harrell Heights Park Development 100,000
87 1732 Argenziano Homosassa Southfork Water Quality Improvement  Project - Phase 5 1,275,000
88 1720 Argenziano Homosassa Wastewater Collection System Project - Phase 5 1,550,000
89 1726 Argenziano Homosassa Wastewater Collection System Project - Phase 6 2,250,000
90 511 Argenziano I-10/SR-14 Utility Improvements 2,800,000
91 1808 Argenziano Independent Living for Retarded Adults, Inc. 75,000
92 9 Argenziano Inmate Health 393,000
93 1615 Argenziano Inverness WWTP Reclaimed Water Upgrades / Eastside WW Collection System 3,950,000
94 756 Argenziano Jasper Regional Wastewater Improvements 1,220,000
95 760 Argenziano Jasper Regional Water Improvements 1,300,000
96 1863 Argenziano Jefferson County Comprehensive Sewer System 400,000
97 4077 Argenziano Jefferson County Courthouse 150,000
98 1134 Argenziano Jefferson County Industrial Park 325,000
99 1310 Argenziano Keaton Beach Boat Ramp Park Expansion 4,000,000
100 1153 Argenziano Keaton Beach Canal Dredging 3,000,000
101 828 Argenziano Lafayette County Courthouse Security 250,000
102 521 Argenziano Lake City Wet Weather Recharge/Reuse Project  (Waste Water Treatment Plant) 5,000,000
103 788 Argenziano Lake Tsala Apopka Water Quality Monitoring and Assessment Initiative 50,000
104 1021 Argenziano Lifestyle Enrichment Center 600,000
105 895 Argenziano Live Oak Wastewater Improvement Project 1,000,000
106 1132 Argenziano Madison County Courthouse 600,000
107 50 Argenziano Madison County Senior Citizens Center 1,900,000
108 429 Argenziano Mahan Drive Phase II 23,000,000
109 155 Argenziano Marion Oaks Water, Sewer & Refuse Infrastructure Expansion Feasibility Study 1,500,000
110 994 Argenziano Mayo Health Services 100,000
111 721 Argenziano North Central Florida Agriculture & Civic Center 2,442,000
112 866 Argenziano Ocala Air Traffic Control Tower 1,500,000
113 2616 Argenziano Old Town Landfill Reclamation 500,000
114 1416 Argenziano Public Safety/Governmental Complex Phase I 7,000,000
115 4026 Argenziano Reconnecting Youth 70,000
116 239 Argenziano Regional 15 Bed Children/Adolescent Residential Substance Abuse Treatment program 1,800,000
117 1191 Argenziano Regional Wastewater Treatment Plant  Expansion Feasibility Study (Silver Spring Shores) 1,500,000
118 33 Argenziano Restoration/Increase Capacity of CINS/FINS Non-Residential Services 2,600,000
119 1302 Argenziano Suwannee County Courthouse 1,000,000
120 1300 Argenziano Taylor Coastal Wastewater Improvements 1,000,000
121 1301 Argenziano Taylor County - Steinhatchee Wastewater 1,000,000
122 1652 Argenziano Taylor County - Steinhatchee Water 750,000
123 822 Argenziano Taylor County Courthouse Renovations 400,000
124 825 Argenziano Taylor County Courthouse Security 200,000
125 1248 Argenziano Taylor County Transportation Program 50,000
126 1236 Argenziano Town of Horseshoe Beach Water Improvements 850,000
127 1135 Argenziano Town of Inglis Stormwater Management Project 400,000
128 3724 Argenziano Town of Lee Wastewater Project 2,500,000
129 1694 Argenziano Tsala Apopka Littoral Shelf Restoration Project 5,000,000
130 238 Argenziano Youth Advocate Programs, Inc. 650,000
131 21 Argenziano Youth Crime Watch of Florida 300,000
132 3633 Aronberg Adult CSU Beds 996,450
133 3626 Aronberg Be HeadSmart, Seniors! Brain Injury and Falls Prevention Project 249,450
134 3465 Aronberg C-51 Sediment Management Project 2,000,000
135 3652 Aronberg CSU Facility Expansion 1,000,000
136 4214 Aronberg Camp Oasis  of the Crohn's & Colitis Foundation of America 50,000
137 3447 Aronberg Canal Point Sanitary Sewer Expansion 600,000
138 282 Aronberg Children's Community Action Treatment Team (CAT) 500,000
139 1117 Aronberg City of Belle Glade Boat Lock 16,200,000
140 2246 Aronberg Contracted Conditional Release Supervision 289,008
141 93 Aronberg DIVERSIFIED AGRISYSTEMS IN CENTRAL SOUTH FLORIDA 6,000,000
142 3062 Aronberg Derelict Vessel Removal 80,000
143 279 Aronberg Edison College Nursing Building 15,158,155
144 331 Aronberg Exotic Removal from Imperial River and Oak Creek 200,000
145 283 Aronberg Family Care Council/Developmental Disabilities Community Outreach 100,000
146 2316 Aronberg Functional Family Therapy 268,000
147 3947 Aronberg Glades County Detention Center 2,400,000
148 658 Aronberg Glades County Public Health Unit 4,275,000
149 657 Aronberg Glades County Public Safety Center 3,220,000
150 659 Aronberg Glades County Small County Courthouse Expansion 550,000
151 664 Aronberg Glades County, Ortona Multi-Use Shelter 250,000
152 1332 Aronberg Glades General Hospital 2,000,000
153 2015 Aronberg Gravity Main Improvements 1,000,000
154 449 Aronberg Greenbriar Lot Assembly Feasibility Program 150,000
155 452 Aronberg Greenbriar Swales, Dog-Hendry System Connection Lots 1,000,000
156 390 Aronberg Harns Marsh Improvements 1,500,000
157 3802 Aronberg Healthy Start Parity and Direct Funding 6,285,000
158 666 Aronberg Hendry County Small County Courthouse Improvements 350,000
159 1865 Aronberg Hospice House for Lehigh Acres 5,000,000
160 2560 Aronberg Initiative to Provide Adequate Detoxification Services to Southwest Florida 1,000,000
161 2148 Aronberg Juvenile Assessment Center for Palm Beach County 5,000,000
162 2325 Aronberg Juvenile Domestic Violence Diversion Program 111,324
163 3061 Aronberg Juvenile Offender Training Center (J.O.T.C.) re-modeling 1,928,000
164 166 Aronberg Lake Region Water Treatment Plant (LRWTP) 3,500,000
165 1152 Aronberg Lake Worth Park of Commerce 800,000
166 1305 Aronberg Library Services to Support Research and Economic Development 1,000,000
167 2380 Aronberg Lower Charlotte Harbor Watershed Initiative 575,000
168 2161 Aronberg Lower East Coast Regional Water Conveyance Solution (L-40 Berm) 1,400,000
169 3041 Aronberg Martin County Sherriff's Office Firearms Training Range 4,000,000
170 2032 Aronberg Pahokee Wastewater System Improvement 2,500,000
171 2026 Aronberg Pahokee Water Main Improvements 750,000
172 275 Aronberg Pediatric Hematology/Oncology Center (Children's Hospital of SWFL) 250,000
173 3464 Aronberg Popash Creek 800,000
174 3043 Aronberg Public Safety Complex Hardened Facilities for Command Post, K-9 Housing Unit and Physical Training Wellness Center 1,500,000
175 455 Aronberg Re-establishment of Historic Flows South 300,000
176 1137 Aronberg SLOW TO FAST 650,000
177 663 Aronberg Senior Center for Glades County 300,000
178 2126 Aronberg South Florida Fair Agriplex-Small Animal Shelter/Barn 300,000
179 389 Aronberg Southwest Lehigh Structures Construction 1,000,000
180 4307 Aronberg Spady Cultural Heritage Phase II Capital Expansion 1,200,000
181 1311 Aronberg Stub Canal Stormwater Improvements for Pineapple Park Neighborhood 1,500,000
182 972 Aronberg Substance Abuse Treatment Diversion 210,000
183 2956 Aronberg Supported Employment Program for the Disabled 235,788
184 2324 Aronberg Trauma Counseling for Victimized Youth 125,000
185 260 Aronberg Veteran's History Project 500,000
186 732 Aronberg Youth Empowerment Center 2,500,000
187 3666 Atwater 800Mhz Radio Infrastructure Upgrade 5,000,000
188 1901 Atwater :  Homeless Residential Assessment Program 671,260
189 1469 Atwater A Child Is Missing 690,000
190 4230 Atwater A Program for Hurricane Intensity Forecast Improvements and Impacts Projections (HiFi) Regional Project Office 199,360
191 3407 Atwater Atlantic Dunes Boardwalk Replacement 100,000
192 1470 Atwater Bel Air Sewer Improvement 3,008,840
193 4042 Atwater Boca Raton Intracoastal Parallel Force Main 660,000
194 1393 Atwater Boynton Beach Community Park and Boundless Playground 1,000,000
195 1818 Atwater Boynton Beach Gated Community Access Project 50,000
196 1705 Atwater Bridges Repair Project 4,500,000
197 1402 Atwater Broward County Shore Protection Project 1,582,800
198 2413 Atwater Business Development Center Network - Institute for Business Continuity and Risk Management Center 500,000
199 3634 Atwater C.O.P.D 350,000
200 2705 Atwater Central Everglades Water Quality Improvement 4,000,000
201 1900 Atwater City Commons and Waterfront Improvements 1,500
202 1709 Atwater City of Fort Lauderdale Annual Maintenance Dredging 2,000,000
203 3014 Atwater City of Port St. Lucie Canal Park Boat Ramp 1,660,000
204 3011 Atwater City of Port St. Lucie Ravenswood Community Center Partnership 4,913,731
205 2130 Atwater City of South Bay Water Treatment Plant 3,500,000
206 3391 Atwater Community-based Dementia-Specific Day Care 450,000
207 1158 Atwater Cottages in the Pines/COURT Project 150,000
208 1419 Atwater Creation of a Health Science Simulation Center to Expand Capacity and Provide Healthcare Worker Training for the 21st Century 5,960,550
209 1136 Atwater Dekelboum Science Center 2,000,000
210 1896 Atwater EOC Multi-Purpose Building 1,000,000
211 768 Atwater Edgewood/River Oaks Drainage Project 500,000
212 1473 Atwater Education/Employment Assistance for Homeless Youth 112,500
213 1545 Atwater Electrified Coral Reef Protection and Restoration Project 50,000
214 1381 Atwater Expansion of PACE Center for Girls, Inc. 1,151,050
215 3418 Atwater FAU/UMMSM Regional Medical Program 4,700,000
216 1966 Atwater Family & Child Literacy Program 175,000
217 3405 Atwater Fire Rescue HQ Generator Replacement 132,500
218 481 Atwater Florida 211 Network 5,000,000
219 164 Atwater Florida Poison Information Center Network 4,795,564
220 1703 Atwater Fort Lauderdale Aquatic Complex 5,000,000
221 1572 Atwater Fort Lauderdale Beach - SR A1A Median Improvement Project 2,400,000
222 3705 Atwater HIV/AIDS program 230,000
223 1607 Atwater Halpatiokee Regional Park Southern Addition 500,000
224 1420 Atwater Homeland Security: Threat Detection and Mitigation Program 600,000
225 3707 Atwater Homeless Residential Assessment Program - Operations Request 207,928
226 1015 Atwater Jimmy Evert Tennis Center HydroCourt Technology 250,000
227 1862 Atwater Joe DiMaggio Children's Hospital Expansion 5,000,000
228 730 Atwater Lake Okeechobee Water Quality Improvement Project at the City of West Palm Beach 3,000,000
229 681 Atwater Lake Worth Lagoon Restoration 3,500,000
230 1706 Atwater Las Olas Transportation Improvements 800,000
231 3064 Atwater Leach Mansion at Riverside Park 300,000
232 1897 Atwater Loxahatchee Groves Strategic and Comprehensive Plan 100,000
233 172 Atwater Loxahatchee River Preservation Initiative 3,254,000
234 1902 Atwater Loxahatchee Slough Bridge Over Northlake Blvd. 1,700,000
235 2786 Atwater Manatee Pocket Dredging Project 2,000,000
236 1604 Atwater Martin County Aquatics Complex 1,000,000
237 1602 Atwater Multimedia Training Station Development Project 37,000
238 998 Atwater NE Drainage Area Improvements 360,000
239 3291 Atwater Nanoscience Institutue for Medical and Engineering Technology (NIMET) at University of Florida 6,825,000
240 1471 Atwater New River Floating Dock Project 600,000
241 3990 Atwater North Boca Raton 2nd Beach Renourishment 1,636,000
242 3974 Atwater North Lauderdale Fire Department Communication System 150,000
243 3942 Atwater North Lauderdale Fire Department Thermal Imaging Equipment 100,000
244 1379 Atwater OSHG for Fiveash WTP 4,500,000
245 1627 Atwater Oakwood Children's Crisis Stabilization Unit 350,000
246 3488 Atwater Ocean Ridge Municipal Complex 2,000,000
247 4229 Atwater Palm Beach County History Museum 150,000
248 878 Atwater Palm Beach Gardens Emergency Operations Center (EOC) 1,500,000
249 4220 Atwater Phase I Anchorage Park Master Plan 400,000
250 1558 Atwater Phase I/New River Dredging Survey and Feasibility Study 56,250
251 1707 Atwater Phase IB - Las Olas Streetscape Project 3,300,000
252 1879 Atwater Place of Hope Seven Stars Emergency Shelter Expansion 750,000
253 3408 Atwater Police Department Generator Replacement 175,000
254 3664 Atwater Pompano  Beach Lift Station Rehab 500,000
255 3273 Atwater Public Safety Automation and Communication 400,000
256 1605 Atwater Public Safety Complex Redundant Generator 410,000
257 3288 Atwater Radar Traffic Car 35,000
258 3474 Atwater Reclaimed Water System Expansion 1,000,000
259 3460 Atwater Reclaimed Water Transmission System 1,000,000
260 1898 Atwater Reuse Lines 2,000,000
261 3196 Atwater Richardson Historic Park Building Restoration 500,000
262 1472 Atwater Safe Shelter for Homeless Youth 352,000
263 3197 Atwater Sanitary Sewer Rehabilitation 500,000
264 1899 Atwater Section 24 Education Center 2,000,000
265 1547 Atwater Senior Advocate Program 50,000
266 1710 Atwater South Side Cultural Center 3,800,000
267 1484 Atwater Special Needs Children Electronic Medical Records 1,300,000
268 2765 Atwater Sponsorship of the 11th International Coral Reef Symposium 150,000
269 4015 Atwater State Road A-1-A Water Main 513,750
270 1712 Atwater Stormwater Pump Station 1 Pollution Control Device 70,000
271 1548 Atwater Stormwater System 250,000
272 3266 Atwater The Center for Disaster and Emergency Training 3,900,000
273 3454 Atwater The New Elliott Museum 2,000,000
274 3425 Atwater Town of Gulf Stream A-1-A Wastewater Collection 4,900,000
275 3294 Atwater Town of Gulf Stream Water Treatment Plant 2,750,000
276 3999 Atwater Town of Lantana Western Wellfield 350,000
277 3463 Atwater Village of Royal Palm Beach Stormwater Enhancement Project 1,315,000
278 2003 Atwater World Trade Center - Tampa Bay 750,000
279 2571 Atwater YMCA Family Center at JayCees Park 5,000,000
280 2643 Atwater eruv project 25,000
281 554 Baker 72-Bed Residential and Outpatient Treatment Facility 1,000,000
282 276 Baker Alternative Water Supply ( AWS) Study 100,000
283 2997 Baker Apopka-Beauclair Nutrient Reduction Facility (NuRF) 2,500,000
284 221 Baker Astor Flood Study Improvement 2,000,000
285 97 Baker Belleview Public Library - New  Construction 500,000
286 53 Baker Belleview Wastewater System Improvement Program 4,125,118
287 216 Baker Big Prairie Watershed Management Plan 740,000
288 542 Baker Children's Crisis Stabilization Unit (CCSU) for Lake and Sumter Counties 646,050
289 159 Baker Community Medical Care Center 250,000
290 605 Baker County Road 466 Improvement from Two Lanes to Four Lanes 6,000,000
291 618 Baker County Road 466A Improvement from Two Lanes to Four Lanes 6,000,000
292 619 Baker County Road 470/48 Improvement from Two Lanes to Four Lanes 7,500,000
293 98 Baker Davis Landfill Area Potable Water Service 1,600,000
294 551 Baker Elder Services Nursing Home Diversion/Pace Program Feasibility Study 75,000
295 1205 Baker Enhancing Employee Work Place Safety 62,899
296 226 Baker Funding for the Transportation Disadvantaged Program 720,000
297 44 Baker Gateway Center for the Arts 1,500,000
298 2995 Baker Harris Chain of Lakes Cyanobacteria Monitoring 250,000
299 2996 Baker Harris Chain of Lakes Restoration Council 750,000
300 66 Baker Implement Reuse Water and Expansion Wastewater Plant, Sewer Line Repair or Replacement, Sewer Line to Snake Island 6,700,000
301 36 Baker Lady Lake Public Library Construction Grant 500,000
302 233 Baker Lake County Emergency Operations Center Funding 3,300,000
303 224 Baker Lake County Health Department 3,000,000
304 272 Baker Lake John Stormwater Improvements 600,000
305 456 Baker Little Haw Creek Master Plan 200,000
306 3284 Baker Magnet High School Partnership 1,800,000
307 410 Baker Methamphetamine Specific Out Client Specific, Intensive Treatment 143,900
308 393 Baker Minneola Waste Water Reclamation & Recharge Project 3,328,552
309 234 Baker Mobility Center for Lake County Public Transportation 7,000,000
310 47 Baker Monteverde Well #4 and Public Safety Building 300,000
311 402 Baker Outclient Services 134,900
312 142 Baker Outreach and Counseling to Homeless Youth and Families 328,070
313 413 Baker Residential treatment Services 1,132,914
314 549 Baker Short Term Residential Treatment Unit for DCF District 13 920,199
315 1365 Baker Social Services Complex 2,000,000
316 280 Baker Solid Waste Collection Unit 175,000
317 37 Baker Spring Hill Community Infrastructure Improvements - Phase IV 750,000
318 1196 Baker Sumter County Big Prairie & Gant Lake Watershed Management Plan (L787) 72,500
319 1197 Baker Sumter County Implementation of Best Management Practices (L788) 100,000
320 385 Baker Tavares Waste Water Reclamation and Recharge Project 471,750
321 143 Baker Trout Lake Nature Center Building 250,000
322 596 Baker Upper Ocklawaha River Basin ( incl. Lake Apopka) Initiative , FY 2007-2008 3,700,000
323 3804 Baker Veterans Business Development and Loan Program 1,668,000
324 96 Baker Waste Tire Litter Control 30,000
325 310 Baker Westside Emergency Flood Management System 1,985,705
326 613 Bennett "One Stop" Community Resource Center 1,000,000
327 345 Bennett Academic Facility , New College of Florida 9,621,763
328 541 Bennett Aquaculture Recovery Program 620,000
329 638 Bennett Arcadia Rodeo Association Complex 1,000,000
330 641 Bennett Arcadia Wastewater Collection System Improvements 1,000,000
331 343 Bennett BRITE (Brief Intervention and Treatment for Elders) Project 468,410
332 278 Bennett Behavioral Health Core Services and Triage Center 3,599,479
333 636 Bennett Builder Care Home Renovations 200,000
334 344 Bennett Building Academic and Administrative Support Infrastructure 1,800,000
335 3335 Bennett Bull Shark Research 175,000
336 408 Bennett Caloosahatchee Creeks 350,000
337 360 Bennett Captiva Water Quality Study 85,000
338 595 Bennett Central West Coast Surface Water Enhancement 10,000,000
339 340 Bennett Charlotte Harbor Research 1,200,000
340 336 Bennett Charlotte Harbor Restoration 500,000
341 548 Bennett Child Support Enforcement  Funding 193,971
342 2101 Bennett City of North Port Stormwater Improvements, Phase 3 500,000
343 2291 Bennett Construction of Manatee Players Performing Arts Center 1,000,000
344 2293 Bennett Contribution to the Expansion of the Wastewater Treatment Plant expansion by installation of a force main pipe line 1,000,000
345 1085 Bennett County - wide Sewer Expansion Study 148,875
346 2253 Bennett Crisis Center Bed Expansion 1,320,000
347 644 Bennett DeSoto County Bridge Project 2,000,000
348 3202 Bennett DeSoto County Courthouse Improvements 350,000
349 642 Bennett DeSoto County Fire Station 1,000,000
350 643 Bennett DeSoto County Phase II Regional Wastewater Plant 1,000,000
351 620 Bennett Domestic  Violence Prevention 1,000,000
352 621 Bennett Domestic Violence Capital Improvement Funding 3,000,000
353 544 Bennett Dream Oaks Camp for Special Needs Children 100,000
354 546 Bennett Education Advancement Anna Maria Community Center 101,665
355 639 Bennett Facilitating Agriculture Resource Management System (FARMS) 2,500,000
356 1086 Bennett Family Services Center 1,250,000
357 341 Bennett Fisheries Habitat Ecology - Charlotte Harbor 300,000
358 612 Bennett Florida Public Health Foundation 300,000
359 2191 Bennett Foster Parent Automobile Insurance Pilot Program 150,000
360 2492 Bennett Hispanic Cultural, Art and Training Center 1,500,000
361 3430 Bennett Infant Building 250,000
362 373 Bennett Institute for Progressive Land Use 840,000
363 1089 Bennett Jail Expansion 1,500,000
364 3615 Bennett Keep America Beautiful Affiliates of Florida 2007-2008 Funding 1,000,000
365 346 Bennett Local/Regional Evacuation Storm Shelter 200,000
366 2231 Bennett Manatee Children's Community Action Team (CAT Team) 1,003,750
367 1098 Bennett Manatee Community College Medical Technology & Simulation Center 919,759
368 607 Bennett Manatee County Citizen Review 150,092
369 3001 Bennett Manatee County Memory Disorder Clinic 250,000
370 727 Bennett Manatee Research 650,000
371 339 Bennett Mobile Command Vehicle 500,000
372 3004 Bennett Myakka River Watershed Initiative 1,000,000
373 597 Bennett Norma Lloyd Park Campus - Leadership & Learning Center 750,000
374 342 Bennett North East Booster Station 2.25 MG Water Tank and high service 850,000
375 4293 Bennett Parents Assuring Student Success 48,500
376 2559 Bennett Peace River Outward Bound: Medical Services 81,000
377 2558 Bennett Peace River Outward Bound: Mental Health Services 60,000
378 734 Bennett Phillippi Creek Septic System Replacement Program 4,000,000
379 992 Bennett Powell Creek/Del Prado Extension 800,000
380 3007 Bennett Pritzker Marine Science Center Enhancements 472,000
381 3013 Bennett Recirculating Systems for Inland Aquaculture 473,000
382 372 Bennett Rehabilitation of Local Bridges 300,000
383 371 Bennett Rehabilitation of Local Roads 7,700,000
384 2278 Bennett Replacement Skilled Nursing Facility 2,000,000
385 2205 Bennett Residential Treatment and Transitional Housing Project 900,000
386 1772 Bennett Sarasota - Venice Rails to Trail - Multi Use Trail 4,000,000
387 552 Bennett Sarasota Bay Restoration 250,000
388 365 Bennett Sarasota NORC  (naturally occurring retirement Community) 200,000
389 3308 Bennett Sawfish Studuies 150,000
390 368 Bennett SeaTrek Distance Learning 550,000
391 615 Bennett Second Chance Home/Maternal Group Home 900,000
392 610 Bennett Senior Enrichment Center 2,500,000
393 397 Bennett South Sarasota/North Charlotte County Regional Emergency Response Improvements 75,000,000
394 338 Bennett Sr. Friendship Center Programs for Positive Aging 150,000
395 3016 Bennett Stock Enhancement 500,000
396 3255 Bennett System of Care for Children with Fetal Alcohol Spectrum 750,000
397 364 Bennett Toledo Blade Boulevard Improvements 5,000,000
398 3002 Bennett TruVine Adult + Youth Prevention Education Program 50,000
399 996 Bennett USF Sarasota-Manatee Enrollment Growth 1,155,000
400 545 Bennett USF Sarasota-Manatee Fund Master  Plan Land Acquisition 9,500,000
401 861 Bennett Utilities/Infrastructure/Capital Renewal/Roofs/Parking/Roadways/Code Compliance 1,537,370
402 740 Bennett Wares Creek (Cedar Hammock) Flood Control Project 1,000,000
403 409 Bennett Water Conservation Project in the City of Cape Coral 15,000,000
404 4100 Bullard A Girl's Place 500,000
405 3239 Bullard Adidjan Estates - Construction of SW Avenue G in Belle Glades 1,484,754
406 2336 Bullard Advanced Wastewater Treatment & Wastewater Reuse Plant 4,950,000
407 1386 Bullard After School Tutoring 25,000
408 527 Bullard Allen Camp and After School Services 400,000
409 507 Bullard Alternative Certification Program (HEC) 417,870
410 2360 Bullard Audubon House Museum 100,000
411 1968 Bullard Bel Aire Park Improvements 600,000
412 1466 Bullard CBO Disaster Preparedness Initiative 100,000
413 669 Bullard Caloosahatchee River Watershed Initiative 7,920,000
414 937 Bullard Capacity Upgrade to North Gables Stormwater Pump Station 125,000
415 421 Bullard Care Center Baker Act Services Program 225,000
416 1713 Bullard Caribbean Palms 1,500,000
417 1711 Bullard Caribbean Palms Childcare 1,500,000
418 3293 Bullard Center of Excellence for the Public Good 1,352,560
419 668 Bullard Central County Water Control District Flood Protection Project 650,000
420 976 Bullard Children's Zone Expansion Project 1,000,000
421 2226 Bullard City of Homestead- Blakey Park Improvements 3,500,000
422 2222 Bullard City of Homestead-East Side Regional Park Design & Development 10,000
423 2359 Bullard City of Key West Stormwater Improvements/SFWMD Ad Velorum request 2,000,000
424 2357 Bullard City of Key West Wastewater Improvements 2,700,000
425 2227 Bullard Communication Subsystem Conversion Project for the Advanced Traffic Management System 5,000,000
426 1380 Bullard Community Food Bank 25,000
427 2344 Bullard Conservation Land Acquisition 600,000
428 1996 Bullard Coral Reef Renovations- Phase II 200,000
429 2361 Bullard Crane House Restoration 400,000
430 1957 Bullard Cutler Ridge Park Improvements 300,000
431 4260 Bullard Develop a Sustainable Water Quality Management Strategy for Reuse Efforts in Miami-Dade County 500,000
432 2362 Bullard Dormitory Construction 200,000
433 512 Bullard Drug Free Youth in Town 1,000,000
434 1063 Bullard Economic Business Development/South Dade Institute 1,151,902
435 1973 Bullard Economic Revialization Study for US-1 70,000
436 1062 Bullard Education/MLK Academy 142,540
437 1373 Bullard Elderly Day Care 25,000
438 2328 Bullard Emergency Assistance for HIV/AIDS Disabled 300,000
439 2330 Bullard Emergency Operations Center Communications 59,650
440 444 Bullard Enterprise Community of Southwest Florida 225,000
441 3823 Bullard Fire Boat South 2,115,000
442 2341 Bullard Fire Station/EOC 1,000,000
443 1269 Bullard Florida City Water System Repair 2,000,000
444 1072 Bullard Florida Fund for Minority Teachers 3,200,000
445 2367 Bullard Florida Keys Aqueduct Authority Alternative Water Supply Projects 3,300,000
446 4284 Bullard Florida Mobile Museum of African American History 700,000
447 1268 Bullard Friedland Manor Flood Mitigation 1,700,000
448 1076 Bullard General Accounting & Legal Services 137,550
449 1338 Bullard Goulds Family Resource Center 100,000
450 925 Bullard Guidance Clinic Women's Residential Substance Abuse Treatment Program 915,000
451 1656 Bullard Harris Field Improvements 875,000
452 673 Bullard Hendry County Airglades Airport Utility System Waste Water Treatment Facility 900,000
453 676 Bullard Hendry County Airport Sears Stormwater Implementation 1,600,000
454 675 Bullard Hendry County Fairgrounds 200,000
455 674 Bullard Hendry County Ft. Denaud Bridge Improvements 300,000
456 678 Bullard Hendry County Lake Okeechobee NPDES Implementation 250,000
457 677 Bullard Hendry County Mid-County Stormwater Improvements Implementation 800,000
458 671 Bullard Hendry County Stormwater  Improvements,  Four Corner's 500,000
459 672 Bullard Hendry County Stormwater  Master Plan Phase II 250,000
460 670 Bullard Hendry County Stormwater Implementation Airglades Industrial Park 1,500,000
461 832 Bullard Hidden Treasures of Tropical America 7,000,000
462 2365 Bullard Homes of Hope Project 2,200,000
463 174 Bullard Improved FCAT Mathematics / Reading Pass Rates 150,000
464 175 Bullard Increased Florida Teacher Retention / Cost Reduction 600,000
465 2800 Bullard Infiltration/Inflow 3,728,600
466 2350 Bullard Islamorada Stormwater Master Plan Implementation 300,000
467 2349 Bullard Islamorada Wastewater Master Plan Implementation 21,900,000
468 2351 Bullard Islamorada Water Qualtiy Monitoring Project 10,000
469 1667 Bullard James Archer Smith Park Lighting System 200,000
470 2721 Bullard Juvenile Pregnancy and Mother Treatment Programs, WINGS and YMCA Character House 365,000
471 2375 Bullard KLWTD  Wastewater Treatment System 15,000,000
472 2799 Bullard Krome Ave Historic District 5,740,000
473 3215 Bullard Lakes Region Disaster Preparedness 300,000
474 2332 Bullard Layton Fire Hydrants 50,000
475 2339 Bullard Little Venice Road Project II 1,250,000
476 436 Bullard Marathon Wastewater Treatment 19,693,000
477 804 Bullard Meeting Basic Needs to Diminish Poverty and Hunger 70,000
478 1342 Bullard Melsan Enterprises, Inc 50,000
479 1340 Bullard Melsan Publishing1, Inc. 45,000
480 2354 Bullard Miami-Dade County  C-103 Canal Outfalls Retrofit 750,000
481 2481 Bullard Miami-Dade County - Amerihomes Drainage Improvement Project 300,000
482 1770 Bullard Miami-Dade County Health Department Main Complex Replacement Facility 10,774,000
483 1024 Bullard Mobile Health Unit 300,000
484 2335 Bullard Monroe County Emergency Operations Center 5,430,000
485 2356 Bullard Monroe County Unincorporated County Wastewater Projects 18,000,000
486 439 Bullard Municipal Marina Public Access 400,000
487 1633 Bullard One Stop Domestic Violence and Sexual Assault Center 50,000
488 488 Bullard Online Teacher Retention & Cost Reduction 600,000
489 775 Bullard Overtown Youth Center, Inc. 400,000
490 2517 Bullard Parks Open Space Master Plan 500,000
491 2241 Bullard Pinecrest Emergency Operations Center Hardening 220,000
492 169 Bullard Prepare for the Future - Immokalee Community School 300,000
493 3396 Bullard Puerto Rican Community  Cultural & Enterprise Center 500,000
494 3801 Bullard Reach 2 Teach Transition and Life Skills Program 125,000
495 3292 Bullard Rebuild Key Largo School Cafeteria to meet EHPA Standards 3,500,000
496 1071 Bullard Rebuild Rehab Loan Initiative 3,707,749
497 505 Bullard Redefinining the Rural High School (HEC) 498,804
498 833 Bullard Science Comes To Life at MetroZoo's Dr. Wilde's World 547,955
499 667 Bullard Senior Center for Hendry County 300,000
500 2797 Bullard Sidewalks/Roadways/Bridge Repairs 4,000,000
501 4197 Bullard Smoke Free Society Education Center 2,000,000
502 936 Bullard Stormwater Flow Enhancement to Pumping Station 250,000
503 3599 Bullard Stormwater System Improvements 1,000,000
504 4049 Bullard Streetscape Enhancements and Beautification Project 1,300,000
505 1649 Bullard Sweet Vine Youth Center 300,000
506 1341 Bullard The Bee Academy 1,250,000
507 3417 Bullard The Carrie P. Meek Center for Business 500,000
508 2355 Bullard The Florida Keys Water Resource Initiative 5,000,000
509 2363 Bullard U.S. Naval Storehouse     Mel Fisher Maritime Museum 487,580
510 1343 Bullard Upper Room Assembly of God Center (URAGC) 1,859,472
511 3426 Bullard Urban Minority Teacher Education Program 389,000
512 1825 Bullard Vandenberg Project 2,100,000
513 805 Bullard Virginia Key Beach Park Museum 1,000,000
514 3937 Bullard Water and Sewer Infrastructure 3,500,000
515 2244 Bullard Water and Wastewater System Improvements 6,060,000
516 958 Bullard West Perrine Exam Room Build 59,017
517 2346 Bullard Workforce Housing 2,000,000
518 811 Bullard You & Me Mentoring Project 500,000
519 2982 Constantine "F.A.S.T. (Future Achievement & Success for Teens" TRACK Program 250,000
520 2999 Constantine Alternative Response System / Family Connections Pilot Project 250,000
521 1020 Constantine Capital Outlay Project 2,175,000
522 954 Constantine Center for Memory Disorders 127,000
523 3026 Constantine City of Longwood/Lyman High School Community Pool 1,700,000
524 2831 Constantine Club FYT 395,000
525 2873 Constantine Cross Florida Greenways Trail (Seminole County/Winter Springs) 1,500,000
526 3250 Constantine Downtown Orlando Creative Village 2,000,000
527 3081 Constantine Fairbanks Avenue Right of Way and Lane Widening 675,000
528 1019 Constantine Historical Museum Complex Expansion, Multi-Purpose Education Building 500,000
529 2754 Constantine Howell Branch Lakes Stormwater Retrofit 700,000
530 1007 Constantine Indpendent Living Project for Homeless Youths 198,600
531 968 Constantine Kid's House of Seminole, Inc. Children's Advocacy Center 100,000
532 2162 Constantine Lake Monroe Surface Water Quality Improvements 1,500,000
533 977 Constantine Lisa Merlin House, Inc. " A Safe Place for a New Beginning" 250,000
534 3042 Constantine Little Wekiva River Water Quality Improvement Initiative 2,000,000
535 1274 Constantine Middle St. Johns River Basin Initiative, FY 2007-2008 4,000,000
536 4118 Constantine NCI Systems, Statewide Intervention Project (VIP) 500,000
537 995 Constantine Parenting Education and Health Support for Orlando's Homeless Adolescents 145,770
538 2817 Constantine Patient Safety Initiative 100,000
539 2959 Constantine Project CLEAR (Community Level Education for Amphetamine Risk-Reduction) 300,000
540 2146 Constantine Reclaimed Water Line Relocation 2,100,000
541 1022 Constantine Seminole Community College Altamonte Springs Campus 500,000
542 1023 Constantine Seminole Community College Building L Renovation 1,200,000
543 2164 Constantine Seminole County Juvenile Drug Court 280,000
544 1166 Constantine Solar Demonstration Facility and Family Learning Center 1,400,000
545 988 Constantine Special Olympics Florida Athlete Health, Wellness and Empowerment Initiative 550,000
546 3012 Constantine Statewide Bald Eagle Rehabilitation, Education and Conservation 50,000
547 3559 Constantine Study for Water Quality Enhancement by Aquatic Plants 200,000
548 1207 Constantine Sweetwater Cove Stormwater Restoration Project 200,000
549 2265 Constantine The Grove Adolescent Vocational Program 225,000
550 1281 Constantine The Lou Frey Institute of  Politics & Government at UCF 500,000
551 3995 Constantine Town of Eatonville Comprehensive Plan Update 250,000
552 3996 Constantine Town of Eatonville Senior Community Center 300,000
553 2435 Constantine Transit Expansion-- East/West Route 1,250,000
554 1422 Constantine Winter Park Bonita Drive Stormwater Treatment 300,000
555 2122 Constantine Winter Park Cultural Center 400,000
556 109 Crist Alzheimer's Law Enforcement Training 250,000
557 2109 Crist Annex Cultural Center 69,164
558 40 Crist Arts for All 300,000
559 1418 Crist Building Hurricane "Hardening" Project 4,000,000
560 41 Crist Community Treatment for Mentally Ill Ex-offenders 650,000
561 1638 Crist Coordinated Community Anti Crime Initiative - Department of Legal Affairs 1,500,000
562 31 Crist DACCO Residential Beds 600,000
563 2077 Crist Duck Pond Area Drainage Improvements 2,000,000
564 32 Crist Entrepreneurial and Business Leadership Youth Program 450,000
565 24 Crist Family Emergency Treatment Center 1,445,000
566 157 Crist Family Justice Center of Hillsborough County, Inc. 500,000
567 131 Crist Florida Aquarium Underwater Archaeology Program 250,000
568 3582 Crist Florida Communities Assessment & Economic Development Project 150,000
569 167 Crist Hillsborough Avenue Improvements (SR 580) 400,000
570 2005 Crist Hillsborough County Main Courthouse Build-out and Renovation 4,000,000
571 29 Crist Homeless Customer Service Center 4,000,000
572 39 Crist Juvenile Workforce Development Initiative 605,000
573 12 Crist Mary Lee's House 750,000
574 213 Crist PRODIGY Cultural Arts Program - Department of Juvenile Justice 2,733,649
575 27 Crist Parental Mentoring Initiative 135,822
576 2554 Crist Pedestrian Bridge - Bullard Parkway 2,000,000
577 3181 Crist Pedestrian Safety Improvements and Streetscaping of Temple Terrace Redevelopment Area 2,500,000
578 2267 Crist Pepin/Patel Cardiology Fellow Teaching Project 1,000,000
579 235 Crist Positive Support for Parents in Neighborhoods (+SPiN) - Department of Juvenile Justice 500,000
580 2552 Crist Purchase of New Patrol Cars 450,000
581 2542 Crist Riverside Park Development - Phase 2 500,000
582 1816 Crist SMART Moves 300,000
583 212 Crist School Aged Youth After School Program (Muller After School) - Department of Juvenile Justice 170,000
584 2546 Crist Security / Vulnerability Improvements 269,000
585 2536 Crist Southeast Distribution Expansion 3,200,000
586 26 Crist Statewide Economic Education and Financial Literacy Program 650,000
587 3506 Crist Statewide Suicide Prevention Program 450,000
588 132 Crist Statewide Teacher Education 338,000
589 2010 Crist Stormwater Utility Pilot 2,000,000
590 152 Crist TBPAC Arts in Education Grant Project 15,000
591 153 Crist TBPAC Challenge Grant Project 50,000
592 154 Crist TBPAC Cultural Facilities Project 500,000
593 1826 Crist Tampa Bay Regional Reclaimed Water and Downstream Enhancement Project 10,000,000
594 125 Crist Tampa Riverwalk 4,700,000
595 211 Crist Teen Empowerment Council - Department of Juvenile Justice 170,000
596 197 Crist The Amazing You 1,000,000
597 3402 Crist The Florida Orchestra Education and Outreach Initiatives 589,178
598 107 Crist The Fowler and Jefferson Northeast Community Center 2,250,000
599 3124 Crist The Salvation Army Children's Village 100,000
600 1382 Crist USF Visual and Performing Arts Building 14,870,000
601 30 Crist Voice Mail Service-Hillsborough 200,000
602 236 Crist Youth Enterprise Experience - Department of Juvenile Justice 600,000
603 108 Crist Youth and Family Alternatives, CINS/FINS Service Center 550,000
604 4278 Dawson AMPS Institute 162,675
605 4071 Dawson Broward County Initative 15,321,840
606 4296 Dawson Child Safety Inititative 126,000
607 3493 Dawson City of Lauderhill Broward Estates Park 300,000
608 3496 Dawson City of Lauderhill Holiday Village Water Main Replacement 1,400,000
609 3494 Dawson City of Lauderhill St. George Park Improvements 800,000
610 3491 Dawson City of Lauderhill Tennis Park 5,000,000
611 3492 Dawson City of Lauderhill West Ken Lark Park Improvements 2,100,000
612 4281 Dawson Community Allstars Program 75,000
613 3019 Dawson Community Empowerment and Revitalization Center 1,000,000
614 4280 Dawson Early Risers: Skills for Success 150,000
615 571 Dawson Emergency  Operations Center 1,500,000
616 3900 Dawson Emergency Power -- Lift stations serving seven critical facilities 441,500
617 2280 Dawson First Accredited Medical School 18,401,657
618 3699 Dawson Florida EMS Tracking and Reporting System 208,000
619 1403 Dawson Garden Acres Sanitary Sewers 4,650,000
620 448 Dawson Homeless Prevention 300,000
621 4270 Dawson Independence Bay Shoreline Restoration 5,000,000
622 3443 Dawson Lauderdale Lakes Alzheimer Care Center Program Expansion 300,000
623 3444 Dawson Lauderdale Lakes C-13 Greenway Project 500,000
624 3445 Dawson Lauderdale Lakes Educational and Cultural Resource Center 1,100,000
625 3446 Dawson Lauderdale Lakes Northgate Park Project 500,000
626 3442 Dawson Lauderdale Lakes Stormwater Improvement Project Phase 3 500,000
627 652 Dawson Lauderhill/Lauderdale Lakes YMCA Family Center 1,000,000
628 2068 Dawson Lift Stations/ Force Main Improvements 750,000
629 2069 Dawson Marina Homeland Security Enhancements 468,750
630 2625 Dawson Mass Transit System Administration Building 4,700,000
631 4113 Dawson Melrose Park - Field and Security Lighting 350,000
632 1730 Dawson Minority Community High Risk HIV/AIDS Outreach Education Initiative 500,000
633 4114 Dawson Northwest Federated Women's Club Renovation 500,000
634 1390 Dawson Oakland Park Blvd. Mast Arm Signalization 2,000,000
635 3490 Dawson Osswald Park  Playground Resurfacing 200,000
636 2569 Dawson Palm Beach Regional Juvenile Dentention Portable Classrooms 400,000
637 1811 Dawson Phase II of the Lake Okeechobee Scenic Trail (LOST) Connections 2,500,000
638 4273 Dawson Pioneer Park Community Shelter 1,000,000
639 4274 Dawson Railway Museum 500,000
640 3793 Dawson Rock Island Sanitary Sewers 3,550,000
641 4232 Dawson Roots Classical Series 200,000
642 2611 Dawson S. H. I. N. E! (Shaping Healthy Images through Nutrition & Education) 110,000
643 4272 Dawson SW 11th Way 3,500,000
644 3847 Dawson Sistrunk Historical Festival, Inc 25,000
645 2527 Dawson The Gospel Complex, Inc 2,000,000
646 3712 Dawson The Hostoric Lamdmark : The Old Dillard Museum 25,000
647 583 Dawson Wingate Redevelopment 4,000,000
648 4245 Deutch Adopt A Grandparent Program 50,000
649 3323 Deutch Boca Raton Multi-Modal Shuttle & Trolley System 15,200,000
650 3322 Deutch Boca Raton Utility Services Protection 300,000
651 3321 Deutch Boca Raton Utility Svcs. Critical Facility Construction 1,100,000
652 1489 Deutch Center for Teaching Excellence & Student Success 800,000
653 540 Deutch Chain of Lakes Restoration 2,000,000
654 3286 Deutch Development of 8 acre training site for public safety usage 1,000,000
655 3283 Deutch Emergency generator for Fire Station number one 350,000
656 4258 Deutch Holocaust Memorial Committee, Inc. 100,000
657 4216 Deutch Holocaust Reference/Research Library 619,236
658 2141 Deutch Mounts Botanical Garden 1,900,000
659 1487 Deutch Recruit & Retain World-Class Graduate Students 1,556,250
660 3896 Deutch Reuse Expansion with new Deepwell Disposal Option 8,500,000
661 4238 Deutch SLOW TO FAST 650,000
662 1138 Deutch Senior Center 2,000,000
663 2659 Diaz de la Portilla Bay of Pigs Museum & Library 100,000
664 1958 Diaz de la Portilla Biscayne Environmental Education Center 1,000,000
665 1042 Diaz de la Portilla Boundless Playgrounds 500,000
666 3770 Diaz de la Portilla C-100/ Bayfront Historic Preservation Project- Phase IA 50,000
667 935 Diaz de la Portilla CAMACOL Florida Trade and Exhibition Center 300,000
668 1223 Diaz de la Portilla CAMACOL/ Florida Bio Trade 300,000
669 737 Diaz de la Portilla City of South Miami Citywide Drainage Improvements 1,850,000
670 738 Diaz de la Portilla City of South Miami Recreational Property Acquisition-Dison Property 400,000
671 736 Diaz de la Portilla City of South Miami Senior Meal Program 150,000
672 739 Diaz de la Portilla City of South Miami Trolley System 180,000
673 1046 Diaz de la Portilla Communication Subsystem Conversion Project for the Advanced Traffic Management System 5,000,000
674 2654 Diaz de la Portilla Continuation/additional of Congregate and Homebound Meals Services- Allapattah 459,758
675 1498 Diaz de la Portilla Elderly Feeding Programs 500,000
676 1554 Diaz de la Portilla Exponica Internatonal 2007 840,000
677 1043 Diaz de la Portilla Fairlawn Storm Sewer Improvements Project, Phase III, B-50704 1,400,000
678 2840 Diaz de la Portilla Flagami / West End Storm Sewer Improvements Project, Phase II, B-50695 1,300,000
679 2389 Diaz de la Portilla Florida Regional Minority Business Council /NMSDC National Conference 250,000
680 2381 Diaz de la Portilla Florida Regional Minority Business Council Minority Business Exchange 500,000
681 1480 Diaz de la Portilla Florida's Pediatric Brain Institute 1,500,000
682 777 Diaz de la Portilla Healthy Lifestyle Education, Alcohol-free, Nutrition, Drug & Smoke Free (HANDS) Program 500,000
683 784 Diaz de la Portilla Hispanic Coalition Corp. Program Support 250,000
684 550 Diaz de la Portilla Kidney Disease Early Detection and Treatment Support 200,000
685 1497 Diaz de la Portilla Kinloch Storm Sewer Improvements Project, B-50705 1,400,000
686 1078 Diaz de la Portilla Latin American Foundation - Education and Orientation to Immigrants 250,000
687 4131 Diaz de la Portilla Latino Public Radio, Inc 3,000,000
688 1068 Diaz de la Portilla Little Havana Activities & Nutrition Center - Child Care Subsidy Program 95,000
689 2803 Diaz de la Portilla Little Havana Activities & Nutrition Center - Dra, Olga Maria Martinez Senior Center 3,000,000
690 3708 Diaz de la Portilla Little Havana Activities & Nutrition Center - Pro-Salud Clinic 150,000
691 1500 Diaz de la Portilla Little Havana Activities & Nutrition Centers Elderly Diabetes Initiative 150,000
692 1224 Diaz de la Portilla Little Havana Activities & Nutrition Centers Elderly Home Delivered Meals Program 500,000
693 2180 Diaz de la Portilla Little Havana Activities & Nutrition Centers Elderly Home Delivered Meals Program 400,000
694 3706 Diaz de la Portilla Little Havana Activities & Nutrition Centers Preventive Nutrition Education for Cardiovascular Disease Program 250,000
695 1501 Diaz de la Portilla Little Havana Activities & Nutrition Centers Respite Program 500,000
696 1077 Diaz de la Portilla Little Havana Activities & Nutrition Centers-  Mildred Pepper Center Development and Relocation 4,000,000
697 3392 Diaz de la Portilla Ludlam Trail 500,000
698 1029 Diaz de la Portilla Miami Film International Festival 200,000
699 564 Diaz de la Portilla Miami River Dredging Project - Federal Channel Advance Funding 13,000,000
700 563 Diaz de la Portilla Miami River Federal Channel Dredging Project 800,000
701 913 Diaz de la Portilla Miami-Dade District Teenage Parent Program 500,000
702 893 Diaz de la Portilla New Trolley Depot - Coral Gables Trolley Program 2,000,000
703 908 Diaz de la Portilla Non-custodial Parent Employment Program (NCEP) 666,000
704 1994 Diaz de la Portilla Old Cutler Road Bicycle Trail Improvements 100,000
705 1059 Diaz de la Portilla PHASES (Preventive Health And Safety Education for Students 360,000
706 1044 Diaz de la Portilla Potable County Water and Fire Protection Improvement Project 5,000,000
707 901 Diaz de la Portilla Purchase of New Equipment - Coral Gables Trolley Program 360,000
708 1499 Diaz de la Portilla Rafael Villaverde Multigenerational Center 3,000,000
709 753 Diaz de la Portilla Recreational Property Acquisition -YMCA Property 3,000,000
710 3701 Diaz de la Portilla Regis House Adolescent & Families Initiative 250,000
711 3517 Diaz de la Portilla SEUS/Japan, Florida-Korea & Florida China Associations 250,000
712 1961 Diaz de la Portilla San Juan Bosco Clinic 218,000
713 441 Diaz de la Portilla Seymour Gelber Adult Day Care Program 100,000
714 1964 Diaz de la Portilla Shands Healthcare/Jackson Health System Indigent Care Appropriation  Request 30,213,021
715 778 Diaz de la Portilla South Florida Sports League 800,000
716 3794 Diaz de la Portilla Stormwater Utility and Management Projects Plan 400,000
717 2986 Diaz de la Portilla Student Financial Aid to Increase Diversity 2,000,000
718 2406 Diaz de la Portilla The Washington Center Internship Program 160,000
719 649 Diaz de la Portilla Village Girls Adolescent Treatment Program 300,000
720 650 Diaz de la Portilla Village Residential Kitchen Improvement Project 520,000
721 829 Diaz de la Portilla Waterway Bank Stabilization 300,000
722 2152 Diaz de la Portilla Watson Island Transportation Improvements 3,000,000
723 932 Diaz de la Portilla West Miami Community Center Senior Citizen Congregate Meals Program 337,280
724 930 Diaz de la Portilla West Miami Phase III Stormwater Improvements 1,000,000
725 933 Diaz de la Portilla West Miami Potable Water System Infrastructure Assessment 250,000
726 2311 Diaz de la Portilla YMCA of Greater Miami - John Cosgrove Youth & Senior Center (JCYSC) 1,000,000
727 2204 Dockery Bronson Care Campus 1,000,000
728 1392 Dockery Brooksville Sewer Rehabilitation Project 2,731,000
729 1394 Dockery Brooksville Water System Improvement Project 1,600,000
730 1179 Dockery Central Florida Regional Transportation Authority (CFRTA) Transfer Station Program 400,000
731 1983 Dockery City of Bushnell Wastewater Collection System Expansion Phase IIIA & IIIB 679,000
732 1982 Dockery City of Center Hill Sewer Transportation System 1,000,000
733 2718 Dockery City of Kissimmee Stormwater Monitoring and Modeling Project 1,000,000
734 1987 Dockery Communications Center Relocations 294,500
735 3295 Dockery Dakota Avenue Conveyance Improvement 1,000,000
736 3550 Dockery Davenport Wastewater Prgoram Ph III 1,500,000
737 1991 Dockery Detail Studies for FEMA Maps 1,000,000
738 1802 Dockery Family Intensive Treatment Team 1,600,000
739 1988 Dockery Historic Courthouse Renovation 3,220,000
740 1990 Dockery Lake Panasoffkee Canal Cleanout 250,000
741 1800 Dockery Lakeland Urban Lake Restoration Initiative 3,000,000
742 759 Dockery Mulberry Civic Center 480,000
743 3304 Dockery NE Water Booster Station 1,000,000
744 1266 Dockery Noah's Landing 2,703,090
745 1232 Dockery Nursing Education at Florida Southern College 1,500,000
746 1287 Dockery Osceola Council on Aging Special Needs Shelter 2,000,000
747 3328 Dockery Phoenix Counseling and Resource Center 2,000,000
748 3781 Dockery Polk City Wastewater Treatment System - Phase I 3,000,000
749 1989 Dockery Potable Water System Expansion 375,000
750 1804 Dockery Recovery Services Complex 2,300,000
751 3263 Dockery St. Cloud Stormwater Grid & Sanitary Swere Plase IV 4,000,000
752 1985 Dockery Sumter County Jumper Creek Watershed Management Plan 234,000
753 1729 Dockery The ARC Nature Coast: Construction/Improvement 1/5/07 750,000
754 3316 Dockery The Phoenix Hope House 1,000,000
755 3309 Dockery US Highway 192 Widening to six lanes from Aeronautical Blvd. to Budinger Avenue 4,250,000
756 179 Dockery Veterans Supportive Housing 300,000
757 3290 Dockery Water Plant #4 1,000,000
758 2667 Dockery Withlacoochee River Watershed Initiative 500,000
759 1293 Fasano Advance Care Planning Education Initiative 250,000
760 468 Fasano Aging and Disability Resource Center/Aging Resource Center Funding 3,300,000
761 129 Fasano Alternative Water Supply Project 4,100,000
762 1488 Fasano Arts Economy for the Nature Coast 500,000
763 2386 Fasano Assistive Technology Emergency Fund 1,000,000
764 486 Fasano CARES Hudson Bayonet Point Enrichment Center Capital Project 450,000
765 533 Fasano Chassahowitzka Area Drinking Water System 3,024,177
766 1952 Fasano Child Care Developmental Services/ Parental Workforce Development 166,400
767 1276 Fasano Child Protective Investigations - Citrus 1,984,715
768 964 Fasano Child Protective Investigations - Pasco 4,809,333
769 514 Fasano Child Protective Investigations - Pinellas Sheriff's Office 1,253,599
770 1324 Fasano Children's Emergency Baker Act Services 450,000
771 1571 Fasano Citrus County Emergency Operations Center 2,500,000
772 1632 Fasano Community Hospital Development 250,000
773 326 Fasano Community Libraries in Caring 200,000
774 262 Fasano Community Treatment for Mentally Ill Ex-offenders 650,000
775 2572 Fasano Connections Job Development Program 20,000
776 1650 Fasano Diabetes Care Coalition 2,000,000
777 491 Fasano Duck Slough BMP Implementation 500,000
778 454 Fasano Dunedin Rail Road Station Restoration 150,000
779 4235 Fasano Economic Development - Pasco County 10,000,000
780 1314 Fasano Emergency Operations Center 4,000,000
781 516 Fasano Enrichment Center Special Needs Disaster Shelter 600,000
782 517 Fasano Faith in Action - Strong for Life 25,000
783 3601 Fasano Florida Disabled Veteran's Business Enterprise Initiative Program 400,000
784 1493 Fasano Healthy Families Pasco Offices 125,000
785 1262 Fasano Homeless Emergency Shelter for Women and Children 40,000
786 532 Fasano Homosassa Wastewater Collection System - Phase 4 (Chassahowitzka Phase 1) 3,425,840
787 1528 Fasano Howard Park Bridges & Causeway Reconstructive Restoration 633,900
788 440 Fasano Indigent Medical Care - Extended clinic hours 550,000
789 2369 Fasano Junior Achievement  Financial Literacy 1,000,000
790 62 Fasano Life Builders Outreach Program, Inc. 195,000
791 469 Fasano Local Services Program for O-A-A Offset 1,337,016
792 457 Fasano Low Cost Pharmacy for Citrus County 150,000
793 1247 Fasano MOSI Monorail Energy Research Interactive Display 2,000,000
794 465 Fasano Memory Mobile (Alzheimer's Mobile Services for Rural Areas, Minority and Underserved Communities) 180,000
795 1430 Fasano Mental Health Services for the Deaf 50,000
796 1306 Fasano Morton Plant Community Education Center 1,000,000
797 1927 Fasano Morton Plant Hospital Memory Disorders Clinic 250,000
798 263 Fasano Noncustodial Parent Employment Program 750,000
799 651 Fasano PACK Summer Camp 100,000
800 483 Fasano PAR Adolescent Intervention Center (PAIC) 725,000
801 1366 Fasano Pasco County Achievers of America Center 2,275,000
802 1103 Fasano Pop Stansell Park 580,000
803 446 Fasano Primary Care Expansion - West Pasco 560,000
804 467 Fasano Purple Heart Monument - City of Dunedin 10,000
805 1631 Fasano Rail Road Square Development 1,000,000
806 1630 Fasano Recreation Center Development 1,000,000
807 391 Fasano Regional Hurricane Shelter/ Clinic 750,000
808 3549 Fasano Rural Community Health Center Electronic Health Record 500,000
809 824 Fasano Sexual Assault Victim Services 4,000,000
810 2123 Fasano Statewide Epilepsy Services Program Funding 2,200,000
811 485 Fasano Telephone Reassurrance/Bill Payer Program for Seniors 201,558
812 392 Fasano The Volunteer Way Food Bank 300,000
813 145 Fasano Utility Under-grounding SR 595 / SR 562 1,100,000
814 1326 Fasano Wall Springs Park 570,000
815 2194 Gaetz Bay Medical Center 911 & EMS Ambulances 500,000
816 3104 Gaetz Choctawhatchee Basin Allaince: Gap Creek Stormwater Improvements 600,000
817 2933 Gaetz Choctawhatchee Basin Alliance: Lisa Jackson park Stormwater Improvements 500,000
818 792 Gaetz Choctawhatchee River and Bay Surface Water Improvement and Management (SWIM) Program 980,000
819 2958 Gaetz Choctawhatchee River and Bay surface Water Improvement Management 100,000
820 3020 Gaetz City of Mary Ester Wastewater Project 450,000
821 2169 Gaetz Destin Emergency Operations Center 6,000,000
822 1170 Gaetz Destin/Ft. Walton Beach Airport, FAA Traffic Control Tower 2,000,000
823 2448 Gaetz Distance Learning Technology 500,000
824 2465 Gaetz Escambia County Artificial Reef 300,000
825 2776 Gaetz Escambia County Marine Multi-Use Facility 4,500,000
826 2919 Gaetz Florida Institute for Human & Machine Cognition (IHMC) 3,000,000
827 2441 Gaetz Holiday Shores Flood Mitigation Project 2,500,000
828 4017 Gaetz Holley-Navarre Fire District Station 45 50,000
829 4007 Gaetz Main Street WWTP Replacement 5,000,000
830 3059 Gaetz Niceville stormwater improvements 1,000,000
831 2538 Gaetz Pensacola Bay Restoration 500,000
832 2523 Gaetz Perdido/Pensacola Beach Erosion/Nourishment Project 1,500,000
833 2522 Gaetz Sacred Heart Health System 2,500,000
834 2533 Gaetz Shuttle Parking Lot Expansion 6,200,000
835 1410 Gaetz South Walton Utilities Wastewater Reuse Improvements 2,000,000
836 2525 Gaetz The Beltway Corridor Feasibility Study 1,500,000
837 2235 Gaetz The National Flight Academy Curriculum Development 1,000,000
838 1540 Garcia Accelerated BSN Program 1,500,000
839 2347 Garcia Arson Investigation Unit 280,000
840 1347 Garcia Baypoint Schools Dental Clinic 140,000
841 1188 Garcia Benny Babcock Park 285,000
842 1182 Garcia CPR Courses for the Community 5,500
843 1189 Garcia City of Hialeah Community Vita Course 18,000
844 1177 Garcia Communication Center Manager 80,000
845 2837 Garcia Communication Computer Aided Dispatch 1,100,000
846 1180 Garcia Community Park Restroom Rennovation 30,000
847 425 Garcia Community Smiles 500,000
848 1663 Garcia Construction of 40MGD Reverse Osmosis (R.O.) Water Treatment Plant 11,000,000
849 1642 Garcia Construction of Sewer Mains for the Annexation Areas 1,350,000
850 1172 Garcia Construction of Water Mains for the Annexation Areas 1,600,000
851 2540 Garcia Cotson Park Safety Tot-Lot Program 99,000
852 1073 Garcia Curtiss Mansion Restoration 1,000,000
853 1186 Garcia David McDonald Park 173,000
854 3571 Garcia Dove 300,000
855 1083 Garcia Downtown Storefront Improvements 400,000
856 1532 Garcia Elderly High Risk Nutrional Meals Program 1,821,250
857 2322 Garcia Emergency Management Radio Linking Device 20,000
858 2326 Garcia Enhance Early Prevention and Intervention Youth Program 4,000
859 690 Garcia Feed the Elderly 150,000
860 1081 Garcia Fellowship House Services for the Uninsured 923,900
861 1087 Garcia Fellowship House Supportive Housing Project 1,135,200
862 926 Garcia Flood Mitigation Project 1,250,000
863 858 Garcia Flood Mitigation Project - Town of Medley 500,000
864 1090 Garcia Florida Center for the Literary Arts 200,000
865 1254 Garcia Florida Hispanic Legislative Foundation Scholarship Fund 50,000
866 2539 Garcia Goodlet Safety Tot-Lot Program 102,000
867 1108 Garcia Gymnasium Emergency Shelter Performing Arts Theater 3,000,000
868 1185 Garcia Hialeah Emergency Rescue and Logistics Warehouse 1,300,000
869 2757 Garcia Hialeah FD Emergency UHF repeater replacement 15,023
870 2719 Garcia Hialeah FD P25 Interoperable Radio Equipment 881,200
871 823 Garcia Hialeah Gardens Water Conservation Project 3,500,000
872 2729 Garcia Hialeah Park Projects 69,000
873 2449 Garcia Home and Community based Telehealth Medicine 250,000
874 3587 Garcia JTIP Transitional 972,000
875 3795 Garcia L.I.F.E. 577,000
876 1611 Garcia Land Development Code 160,000
877 569 Garcia League Against Cancer 2,000,000
878 2834 Garcia Learn to swim courses  for the community 20,000
879 1184 Garcia Learning Activities and Reading Initiative 8,900
880 1954 Garcia Learning Through Listening® 1,500,000
881 1187 Garcia Leon O'Quinn Park 140,000
882 927 Garcia Low Income Senior Facility 2,000,000
883 431 Garcia Medley Municipal Services Facility 3,000,000
884 2704 Garcia Miami Institute for Human Genomics 80,000,000
885 1066 Garcia Miami Lakes Park Clubhouse and Gymnasium 1,000,000
886 1055 Garcia Miami Lakes Stormwater Improvement 400,000
887 938 Garcia Mildred & Claude Pepper Senior Center 650,000
888 1175 Garcia Mobile Generator 160,000
889 1593 Garcia Municipal Park Improvements (Doral North Park Project) 2,500,000
890 2264 Garcia Municipal Park Improvements (Miami West Park - Doral) 2,500,000
891 2236 Garcia Municipal park Improvements (Bikeway and Trail System - City of Doral) 2,000,000
892 945 Garcia Neighborhood Revitalization Planning Study 100,000
893 2644 Garcia Neighborhood Watch/Homeland Security-Natural Disaster Education 200,000
894 3248 Garcia Nuevo Caminar Recovery Home Center 900,000
895 1075 Garcia Planning study for conversion of 30 acre golf course to public use 40,000
896 1174 Garcia Post Hurricane Carbon Monoxide monitors 75,000
897 1112 Garcia Potable Water Line Repairs 500,000
898 2372 Garcia Public Access Defribillators 250,000
899 2337 Garcia Public Works Fuel Site Upgrade 750,000
900 1181 Garcia Refrigerated Emergency Response Vehicle 225,000
901 1171 Garcia Rehabilitation and Upgrades of Priority Pump Stations 1,000,000
902 1173 Garcia Relining of Sewers Mains 770,000
903 1056 Garcia Royal Oaks Park Community Center 600,000
904 1106 Garcia Sanitary Sewer Line Repairs 1,000,000
905 1603 Garcia Sewer Pump Station Improvements - City of Doral 100,000
906 1183 Garcia Shade Structures Community Pools 5,500
907 2488 Garcia Slade Park Safety Tot-lot Program 160,000
908 1336 Garcia Storm Water Master Plan III 400,000
909 2290 Garcia Stormwater Drainage Improvements (City of Doral) 500,000
910 1102 Garcia Stormwater Utility Improvements 500,000
911 1980 Garcia Support Helicopter for Fire Suppression and Flood Rescue 2,500,000
912 1178 Garcia Telestaffing Software 100,000
913 2869 Garcia The Hispanic Business Enhancement Project 250,000
914 1355 Garcia Virginia  Gardens/Miami Springs Entrance Improvements 325,000
915 1350 Garcia Virginia Gardens City Hall Renovations 400,000
916 1368 Garcia Water Net Improvement 150,000
917 1176 Garcia Wireless Laptop Computer Communications 90,000
918 853 Garcia Youth Development Strategies 1,500,000
919 1847 Geller Autistic Program 1,000,000
920 1727 Geller City of Fort Lauderdale Mutual Aide Response Team (SMART) 60,000
921 952 Geller City of Hollywood Mast Arm Signalization Project 741,067
922 1766 Geller Davie Wastewater Improvements 225,000
923 1788 Geller Davie Water Treatment Plant Improvements 600,000
924 2040 Geller Emergency Portable Generator Storage 800,000
925 2039 Geller Emergency Power- Lift stations serving seven critical facilities 441,500
926 2030 Geller Equipment for Emergency Operations Center 31,593
927 1915 Geller Greater Hollywood Pre-School/Special Needs Playground 100,000
928 1846 Geller Gun Buy Back Program 25,000
929 896 Geller Hallandale Beach After School Tutorial Program 150,000
930 907 Geller Hallandale Beach Cultural Community Center 500,000
931 985 Geller Holocaust Documentation & Education Center Rail Car Preservation Project 200,000
932 978 Geller Holocaust Documentation & Education Center Rail Car Site Renovation Project 350,000
933 997 Geller Holocaust Documentation & Education Center Renovation/Preservation Project 350,000
934 3853 Geller IGFA Environmental Education Program 250,000
935 1744 Geller Joe DiMaggio Children's Hospital Craniofacial Program 250,000
936 1757 Geller Oakes Road Intermodal Bridge PD&E Study 250,000
937 1955 Geller Oral Rabies Vaccine Bait Program 1,800,000
938 1946 Geller Port Everglades Inlet Sand Bypassing Project 425,000
939 903 Geller Regional Emergency Operations Center 1,000,000
940 3514 Geller Rehabilitation Of Historic SW 11th Ave. Bridge 3,400,000
941 1976 Geller Senior Center Expansion 1,500,000
942 1854 Geller Solar Street Lighting Project for Census Tract 804.02 Block 1 250,000
943 1866 Geller Southwest Community Center 250,000
944 1858 Geller Water Main Looping Upgrades 500,000
945 2437 Haridopolos Brevard County Veterans Memorial Center 1,800,000
946 3306 Haridopolos By the River: Senior Affordable Housing Demonstration Model 1,900,000
947 745 Haridopolos Children's Advocacy Center for Osceola County, Inc. 200,000
948 3737 Haridopolos City of Vero Beach Playground ADA improvements 60,000
949 3533 Haridopolos EGRET MARSH STORMWATER PARK 2,100,000
950 3739 Haridopolos Emergency Centers Roof Reinforcement 130,000
951 4035 Haridopolos Emergency Operations Center Technology 2,000,000
952 3663 Haridopolos Expansion to Indian River County Shooting Range 250,000
953 2432 Haridopolos George King Blvd Expansion 4,000,000
954 4192 Haridopolos Hibiscus Children's Center Residential Services 300,000
955 3600 Haridopolos IRFWCD MAIN RELIEF CANAL POLLUTANT REMOVAL SYSTEM 2,000,000
956 1937 Haridopolos Indian River Lagoon Issues Team 13,717,028
957 3268 Haridopolos Kissimmee Upper Basin Restoration 800,000
958 3627 Haridopolos Operation QuestKids! 250,000
959 3276 Haridopolos Poinciana Biopharmaceutical Park 20,000,000
960 4240 Haridopolos Power System Peparedness/Indian River 2,500,000
961 3619 Haridopolos ROCKRIDGE SURGE PROTECTION PROJECT 3,000,000
962 3631 Haridopolos Sector 3 Beach Restoration 10,000,000
963 3722 Haridopolos Spoonbill Marsh 2,225,000
964 4068 Haridopolos Sweet Sorghum for Ethanol Program (SSETH) 850,000
965 3254 Haridopolos Teacher Enrichment for Science, Math & Technology 350,000
966 3632 Haridopolos Transitional Living Program 750,000
967 3857 Haridopolos Treasure Coast Food Bank Emergency Food Warehouse 500,000
968 3757 Haridopolos U.S. Highway One widening between 49th Street and 65th Street, Indian River County 20,000,000
969 2608 Haridopolos Upper St. Johns River Basin Initiative, FY 2007-2008 4,600,000
970 3774 Haridopolos Vero Lake Estates Sewer 2,500,000
971 3287 Haridopolos Water Quality Improvements to the Indian River Lagoon - City of Vero Beach Septic Tank Conversion Program 1,500,000
972 722 Hill 4 MGD Pipeline to Reclaimed Water Reservoir and Recharge Basin 1,500,000
973 4044 Hill Amer-i-can 100,000
974 504 Hill Ashley Oak 81,250
975 1214 Hill Bay Street Stormwater Improvements - Phase 1B 2,000,000
976 1220 Hill Beach Concrete Line Sewer Replacement 750,000
977 3382 Hill Children Treatment & Intervention 150,000
978 105 Hill Children's Medical Services Building Completion-Jacksonville 7,057,400
979 1045 Hill Concrete Sewer Line Replacement 750,000
980 3920 Hill Creating Memories 20,000
981 1715 Hill Discovery 07 50,000
982 1225 Hill Enhancing Leadership Skills with Youth for Academic & Social Success 200,000
983 4290 Hill FCCJ North Campus Running Track Resurfacing & Lighting 145,000
984 1746 Hill Family Crisis Help Center, Inc 189,000
985 1257 Hill Family Literacy Program 122,000
986 2438 Hill Harry T. and Harriette V. Moore Home Replica 250,000
987 3072 Hill Lincoln Villas Septic Tank Phase Out Project 2,352,000
988 1054 Hill Metro Kids Konnection After School Program 150,000
989 2922 Hill Northwest Mutipurpose Community Center 5,000,000
990 1227 Hill Nurse Managed Community Clinic 1,000,000
991 217 Hill PD&E Old Kings Drive from Forrest Grove Dr. to Old Kings Road 150,000
992 220 Hill PD&E and lane addition to Old Kings Road from Farragut to Forest Grove Drive 350,000
993 1213 Hill Potable Water River crossing 750,000
994 1115 Hill Re-entry Project Independence 1,300,000
995 1216 Hill Reclaimed Water Reservoir 2,000,000
996 3298 Hill Reduce Racial/ Ethnic Disparities in HIV and STD in Duval County 999,040
997 2709 Hill SR 100 to US 1 Connector Road 3,250,000
998 717 Hill South Street Stormwater Improvements 1,000,000
999 570 Hill Suited for Success Jacksonville 300,000
1000 3617 Hill Summer Bridge Transitional Program 500,000
1001 1233 Hill Sustaining the Legacy:  Protection Planning for the Future of our Past 150,000
1002 3173 Hill The Ashley Oaks Development 556,250
1003 4149 Hill UF/Shands Proton Therapy Institute  (UFPTI)Cancer Treatment and Pain Management 585,000
1004 1359 Hill UNF-EWC Joint Use Facility 6,000,000
1005 2707 Hill Utility Relocation Funding for SR 100 Widening 770,200
1006 1250 Hill Water and Sewer Projects and Lift Station Expansion 1,700,000
1007 2076 Jones AVRF- Look, Listen, Learn 152,000
1008 1561 Jones Alzheimer Respite Program 100,000
1009 880 Jones Belleair Boat Ramp 430,900
1010 522 Jones Bridges of America's 25 Drug & Alcohol Beds for Women at the St. Petersburg Bridge 587,250
1011 3457 Jones Child Protection Investigations- Sheriff's Funding 1,253,599
1012 520 Jones Education and Training for Emergency Care Providers 1,500,000
1013 812 Jones Emergency Operations Center 4,000,000
1014 2544 Jones Florida's Teaching Nursing Home Program 625,000
1015 1562 Jones Fort. DeSoto Park Fort Restoration 500,000
1016 295 Jones HEP Community Kitchen and Dining Facility 300,000
1017 1892 Jones Krug Health Center Pinellas 200,000
1018 2277 Jones Orientation to ICCD Clubhouses 250,000
1019 919 Jones PANAMA KEY ISLAND POWER 350,000
1020 905 Jones Pinellas County "Blueway" 150,000
1021 4166 Jones Project CRAFT--St. Petersburg 325,000
1022 1164 Jones Public Receiving Facility Service 1,269,212
1023 1876 Jones Sun Coast Family Care Center - Pinellas 200,000
1024 534 Jones Tampa Bay Restoration 2,000,000
1025 144 Jones Veterans' Outpatient Services: WestCare Florida Veterans' Empowerment & Transition (VET) Program: 497,120
1026 146 Jones Veterans' Transitional Housing: WestCare Florida Veterans' Empowerment & Transition (VET) Program 485,434
1027 74 Jones Willa Carson HRC Health Care Project 150,000
1028 2334 Joyner "Enough is Enough" High Crime Neighborhood Community Youth/Juvenile Crime Prevention Initiative 1,000,000
1029 2777 Joyner 24 hour Electronic Alcohol Monitoring 100,000
1030 61 Joyner Achievement in Community Education Transformation 400,000
1031 1831 Joyner Children's Heart Center at St. Joseph's 1,000,000
1032 3226 Joyner Childs Park Family Stabilization Program 100,000
1033 3180 Joyner Childs Park Summer Intern Youth Program 100,000
1034 1887 Joyner Columbus Drive Bridge 2,120,000
1035 335 Joyner Community Based Case/Disease Management 750,000
1036 90 Joyner Drew Park Drainage Improvements 5,000,000
1037 688 Joyner East Henry Academy 2,125,000
1038 112 Joyner Everyone's Youth United Personal Motivation Substance Abuse Prevention Program 200,000
1039 2900 Joyner Florida Senior Legal Helpline 250,000
1040 60 Joyner GHETTREAL Community Services 250,000
1041 1012 Joyner Guardian Angels Children's Home 150,000
1042 3612 Joyner H. Lee Moffitt Cancer Center & Research Institute 27,000,000
1043 1871 Joyner KidShapers 150,000
1044 1810 Joyner Leadership Through Education 10,000
1045 742 Joyner Louise Graham Regeneration Center 360,000
1046 3584 Joyner North Tampa Community Health Center, Inc. 1,500,000
1047 88 Joyner Parenting Wisely/Choices (Brandon Adolescent and Family Substance Abuse Prevention and Treatment 300,000
1048 1061 Joyner Still Standing 200,000
1049 2137 Joyner The Amer-I-Can Life Management Skills/Gang Intervention Program 1,000,000
1050 158 Joyner YMCA Youth & Family Center 500,000
1051 1058 Joyner Your Place Inc. 100,000
1052 949 Justice Alternative Water Resource Development 7,500,000
1053 2530 Justice Central Energy Plant 5,000,000
1054 2561 Justice Class Acts Education Performance Series and Community Arts Program 87,500
1055 1079 Justice Dale Mabry (US 92/S.R. 600) Flood Protection 2,500,000
1056 1544 Justice Eagle Lake Park 670,000
1057 2739 Justice High School Campus Monitor Pilot Program 220,000
1058 1668 Justice Joe's Creek Greenway 339,000
1059 1790 Justice PARC Statewide Multi-Hazard Shelter for the Severely Developmentally Disabled 8,200,000
1060 416 Justice Park Boulevard Infrastructure Improvements 2,500,000
1061 1886 Justice Platt Street Bridge 3,180,000
1062 3852 Justice Project TRADE-Ocala 1,500,000
1063 2599 Justice Statewide Coastal Ocean Research Vessel 15,000,000
1064 1785 Justice The Arts Center and Chihuly Museum Facility 12,000,000
1065 2400 Justice University of South Florida Component of  Medical Student Base Funding Level 7,365,899
1066 2788 King Atlantic Highlands Septic Tank Phase Out Project 1,815,000
1067 134 King Beaver Street Enterprise Center 500,000
1068 1092 King Best Buddies Middle Schools, High Schools, Colleges, Citizens and e-Buddies 1,600,000
1069 77 King Beverly Beach Wastewater Facilities (Small Community Program) 2,000,000
1070 80 King CR305 Bridge Replacements and Roadway Improvements 13,092,784
1071 82 King Civic Arena 1,000,000
1072 723 King DBCC Building 100 Remodel, Renovate 311,683
1073 699 King DBCC Campus Rewal II 2,010,846
1074 703 King DBCC Land Acquisition 2,000,000
1075 716 King DBCC Mori Hosseini Hospitality Training Facility 13,677,638
1076 720 King DBCC Remodeling / Renovations Buildings 300, 430, 700 3,510,887
1077 693 King DBCC Renovation, Remodeling Utilities, Site Improvement 4,225,750
1078 859 King Daytona Beach LPGA ISB Sewage Lift Station 1,000,000
1079 867 King Daytona Beach Reclaimed Water Reservoir and Recharge Basin 2,000,000
1080 864 King Daytona Beach Water and Sewer Projects and Lift Station Expansion 1,700,000
1081 2094 King Enhanced Reclaimed Water Irrigation System 133,333
1082 3473 King FSU Film School - Film Commission 200,000
1083 78 King Florida Agricultural Museum 1,500,000
1084 1637 King Florida School for the Deaf and Blind Jax HATS 110,000
1085 3610 King Historic Capitol Facility Improvements 1,206,404
1086 2760 King Hogan's Creek Greenway 800,000
1087 83 King Interchange at Interstate 95 in Palm Coast 1,000,000
1088 2018 King JEA Reclaimed Water  Transmission Line 266,666
1089 1960 King JEA Reclaimed Water Transmittal Line Extension 500,000
1090 1423 King Jacksonville Beach Modifications to Upgrade Wastewater Treatment Facilities to Advanced Wastewater Treatment 9,000,000
1091 963 King Junior Achievement Academy Partnership 1,000,000
1092 573 King Lower St. Johns River Basin Initiative, FY 2007-2008 17,000,000
1093 2697 King Mayport Ferry Operation 396,030
1094 1680 King Nassau County Judicial Annex Courthouse 969,636
1095 779 King Operation New Hope/Ready 4 Work 500,000
1096 136 King Ormond Beach Hidden Hills Sewer System 4,000,000
1097 2945 King Rhoda L. Martin Cultural  Heritage Center 150,000
1098 1297 King Schultz/UNF Professional Development Outcomes Research Project 999,893
1099 3349 King Sister's Creek marina 3,656,400
1100 84 King Small County Courthouse Construction 3,000,000
1101 3693 King St Johns County Cultural Arts Center 1,000,000
1102 3764 King State Road 9B 8,200,000
1103 137 King Stewart Marchman Residential Treatment Expansion (Flagler County) 1,000,000
1104 117 King WJCT Inc., Building Capital Outlay HVAC/Building Upgrades Project 2,951,357
1105 1474 Lawson 17th Street Stormwater & Safety Improvements 6,301,565
1106 3201 Lawson Aboveground Water Tank 150,000
1107 1464 Lawson Advanced Renewable Energy Program (ARE) 2,000,000
1108 1161 Lawson Advanced Wastewater Treatment Improvements 10,000,000
1109 656 Lawson Agriculture Film Collection Pilot Project 250,000
1110 1428 Lawson Altha Sewer System 8,000,000
1111 1426 Lawson Altha Water System Upgrade 1,000,000
1112 2656 Lawson Alzheimer's REACHOUT Florida 540,000
1113 1550 Lawson Apalachicola Bay Seafood Industrial Park 1,500,000
1114 798 Lawson Apalachicola River and Bay Surface Water Improvement and Management (SWIM) Program 4,000,000
1115 1622 Lawson Apalachicola Wastewater Improvements 1,000,000
1116 2024 Lawson Apalachicola Waterfront Visioning & Redevelopment Planning Process 250,000
1117 2027 Lawson Basin & Sewer Rehabilitation 7,000,000
1118 2100 Lawson Bay County M.B. Miller Pier Replacement Project 3,000,000
1119 2025 Lawson Bay/Gulf Florida Assertive Community Treatment Team 543,000
1120 1475 Lawson Big Bend Homeless Coalition 350,000
1121 2930 Lawson Billy  Joe Rish  Park 2,500,000
1122 1319 Lawson Bond Community Health Center, Inc. 3,000,000
1123 1495 Lawson Boom Truck Purchase & Operation 85,801
1124 1556 Lawson Buck O'Neal Statue & Sign 100,000
1125 2063 Lawson Callaway Public Safety Building/Emergency Operations Center 500,000
1126 3257 Lawson Campbellton Elevated Tank and Demolition 1,500,000
1127 3082 Lawson Campbellton VFD Fire Truck 200,000
1128 3204 Lawson Campbellton Waterline Rehab 550,000
1129 3242 Lawson Campbellton Well Rehab 500,000
1130 3278 Lawson Campbellton cable system 250,000
1131 3228 Lawson Capital Cascades Segment 2 3,000,000
1132 773 Lawson Capital Circle Southeast 5,500,000
1133 1331 Lawson Carrabelle Recreation Park  Phase III 200,000
1134 1329 Lawson Carrabelle River/St. George Sound Water Quality Improvements 1,400,000
1135 701 Lawson Character First Family Training 8,500
1136 1391 Lawson Charles Kenzie Steele, Sr. Human Rights Institute & Museum 250,000
1137 1461 Lawson Chipola Conference Center 50,000
1138 1564 Lawson City of Apalachicola Stormwater Quality Improvements 3,000,000
1139 1067 Lawson City of Blountstown Sewer Rehab Phase VI 2,200,000
1140 1069 Lawson City of Blountstown municipal Replacement Building 300,000
1141 4006 Lawson City of Carrabelle Police Department 27,000
1142 4004 Lawson City of Carrabelle/Buck O'Neil Park 25,000
1143 2317 Lawson City of Jacob City Hall 700,000
1144 2279 Lawson City of Jacob Potable Well and Rehabilitation 675,000
1145 2305 Lawson City of Jacob Senior/Community Center 315,000
1146 2294 Lawson City of Jacob Volunteer Fire Department 445,000
1147 2285 Lawson City of Jacob Waterline Extension Project 675,000
1148 1252 Lawson City of Marianna Stormwater Drainage Improvement Project 10,000,000
1149 1255 Lawson City of Marianna Wastewater Collection System 20,000,000
1150 1388 Lawson City of Marianna Water TransmissionSystem 30,000,000
1151 1320 Lawson City of Midway Fire Fighter Training Facility 700,000
1152 1725 Lawson City of Monticello Reuse Project 500,000
1153 3049 Lawson Co-curricular Activities/Minority Outreach 3,035,000
1154 2056 Lawson College Readiness Initiative 275,000
1155 1702 Lawson Compass Lake Boat  Ramp Improvements 75,000
1156 1722 Lawson Competency restoration / short-term residential program 2,044,000
1157 2042 Lawson County  Road 390 Widening Project 39,000,000
1158 1502 Lawson Courthouse Security Issues 400,000
1159 2668 Lawson Crossroads Mentoring Program 25,000
1160 2047 Lawson Deer Point Reservoir Dirt Road Stabilization Project 2,100,000
1161 1728 Lawson Development of a Florida Waste Glass Processing Facility 2,500,000
1162 1483 Lawson Dirt Road Paving Projects 2,000,000
1163 1478 Lawson Drainage and Street Improvements 600,000
1164 1636 Lawson Emergency Communications Center 5,000,000
1165 1235 Lawson Emergency Operations Center - Jefferson County 800,000
1166 1591 Lawson Eugene Lamb Jr. Recreation Center Park & Enhancement 50,000
1167 1563 Lawson FCPL Construction, Eastpoint 250,000
1168 4036 Lawson Family Training and Resource Center 400,000
1169 931 Lawson Farm Share Food Recovery Program 600,000
1170 1322 Lawson Farm Share Food Recovery Program -Distribution Site in Gadsden County 750,000
1171 1387 Lawson Females and Families in Transition 150,000
1172 1486 Lawson Fire Department Disaster Mitigation 400,000
1173 1481 Lawson Fire Engine (Ladder & pumper Truck) 500,000
1174 2054 Lawson Fire Fighter Training Upgrade - Fire Truck Acquisition 375,000
1175 1315 Lawson Florida African American Hertiage Preservation Network 350,000
1176 2197 Lawson Florida Green Procurement Initiative 1,750,000
1177 1909 Lawson Florida Renewable Energy Resource Map 400,000
1178 1560 Lawson Franklin County Courthouse Security 300,000
1179 1971 Lawson Franklin County Regional Utility 2,000,000
1180 1797 Lawson Gadsden County Community Hospital Renovations 1,500,000
1181 1796 Lawson Gadsden County Courthouse Renovations 900,000
1182 1799 Lawson Gadsden County Emergency Shelter/Community Facility 18,000,000
1183 1793 Lawson Gadsden County G*STARS (Gadsden Students Training Academy for Reaching Success) 250,000
1184 1795 Lawson Gadsden County Public Safety/Criminal Justice Complex 22,000,000
1185 1794 Lawson Gadsden County Water/Sewer Infrastructure 12,000,000
1186 1396 Lawson Girls Leadership Institute 75,000
1187 4008 Lawson Graceville Manhole Rehab 850,000
1188 3120 Lawson Graceville Sewer Improvements 1,000,000
1189 2043 Lawson Grand Lagoon Bridge Replacement and Road Widening Project 14,700,000
1190 1400 Lawson Grand Ridge Wastewater Improvements 1,000,000
1191 3344 Lawson Greenville Hills 922,000
1192 1880 Lawson Gretna Inflow/Infiltration 1,000,000
1193 1881 Lawson Gretna Wastewater Plant Expansion/Improvement 2,000,000
1194 2058 Lawson Ground Storage Tank and Booster Pumps, Fill Lines & Distribution Lines 3,000,000
1195 2151 Lawson Gulf Beaches Sewer 2,767,328
1196 2173 Lawson Gulf County Courthouse Renovation 350,000
1197 1318 Lawson Havana Fire and Emergency Medical Station Expansion 99,000
1198 1316 Lawson Havana North Water Main Loop Connection 175,000
1199 1888 Lawson Highway 12/ Interstate 10 Water and Sewer Extension Project 2,000,000
1200 2696 Lawson Historic Tallahassee Waterworks 400,000
1201 2870 Lawson Homeless Day Resource Center 65,000
1202 3307 Lawson Improving Student Stations 14,000,000
1203 1678 Lawson Jackson County Administraion Building Complex 8,000,000
1204 1624 Lawson Jackson County Emergency Operations Center 200,000
1205 1625 Lawson Jackson County Fire Rescue Upgrades and Construction of New Substation 750,000
1206 700 Lawson Jackson County Health Department 10,000,000
1207 1640 Lawson Jackson County Wastewater System County Wide Feasibility Study 750,000
1208 1643 Lawson Jackson County Water/Wastewater Improvements 2,230,000
1209 2006 Lawson Jefferson County Agriculture and Community Development Center 1,750,000
1210 655 Lawson Liberty County Courthouse Expansion and Renovation 500,000
1211 139 Lawson Liberty County Special Needs Facility 500,000
1212 3366 Lawson Liberty Wilderness 4,888,000
1213 2037 Lawson Local Health Planning Councils 1,200,000
1214 4111 Lawson Love Force and Encouragement for the able and disbled 375,000
1215 1541 Lawson Low Income Emergency Home Repair (LEHAP) 5,000,000
1216 1789 Lawson Male Responsibility Youth Project 50,000
1217 2023 Lawson Martin Lake Restoration 1,000,000
1218 2036 Lawson Mexico Beach AWT Project 800,000
1219 2917 Lawson New Collection System and Wastewater Treatment Plant Update 1,000,000
1220 2045 Lawson Norris D. Langston Youth Foundation, Inc. Educational and Economic Development Center 400,000
1221 1791 Lawson Nurturing Fathers Program 50,000
1222 4080 Lawson Office Equipment Modernization 37,100
1223 2790 Lawson Old West Florida Enrichment Center Outreach Programs 305,000
1224 2202 Lawson Panhandle SART Program 250,000
1225 1370 Lawson Parenting Education and Involvement Program 80,000
1226 1792 Lawson Performing Arts Empowerment Program 30,000
1227 791 Lawson Phase II, Regional Water Supply 2,500,000
1228 2021 Lawson Prenatal Care for Uninsured Mothers 15,750
1229 1125 Lawson Recycling Coordinator Training 175,000
1230 1828 Lawson Rosedale Water Association Critical Systems Repairs 550,000
1231 2049 Lawson Site Identification/Preliminary Design for Subregional Wastewater Plan 1,000,000
1232 704 Lawson Sneads City Hall Rehabilitation 100,000
1233 771 Lawson Sneads Emergency Services Building Rehabilitation 250,000
1234 705 Lawson Sneads Potable Well and Waterline Rehabilitation Project 463,000
1235 718 Lawson Sneads Transmission System and WWTP Rehabilitation 700,000
1236 769 Lawson Sneads VFFD EMS Equipment 100,000
1237 1131 Lawson Stateside Expanded Polystyrene Collection and Densification Project 2,000,000
1238 1724 Lawson Statewide CARD Programs-Autism Programs 10,218,000
1239 1889 Lawson Statewide Support for food banks and food pantries 450,000
1240 3552 Lawson Structural Repairs to Crooked River 100,000
1241 1542 Lawson Suspension Termination Opportunity Program (STOP) 1,000,000
1242 1361 Lawson Tabernacle Community Empowerment Program 100,000
1243 1363 Lawson Tabernacle Family Life Center 1,500,000
1244 1851 Lawson Targeted Outreach Prevention Project (TOPP) 1,280,490
1245 1848 Lawson The Dezell House Historic Restoration 332,500
1246 1193 Lawson The Florida Center for Preforming Arts and Education 5,000,000
1247 4030 Lawson The George Washington Carver Institute 300,000
1248 1321 Lawson The Mothers In Crisis Initiative to Impact Recidivism Among Female Inmates 150,000
1249 1360 Lawson The Sojourner Truth Reading Program 75,000
1250 2640 Lawson The Starting Point Ministries Inc. Mental Health and Substance Abuse Treatment Project 288,000
1251 2275 Lawson Town of Malone Fire Truck 210,000
1252 2250 Lawson Town of Malone Health Clinic 100,000
1253 2234 Lawson Town of Malone WWTP and Sewer Line Expansion Preliminary Engineering 83,500
1254 2229 Lawson Town of Malone Waterline Rehabilitation Project 575,000
1255 2745 Lawson Trauma Service Area #3 Mortality Reduction Infrastructure 5,000,000
1256 1708 Lawson US 19 North Watermain Expansion 750,000
1257 1432 Lawson US 319 R-O-W East Ivan to Leon County Line 1,000,000
1258 2038 Lawson Upgrade four high-service pumps at water treatment plant 5,700,000
1259 3337 Lawson Vocational Alternative School 416,320
1260 4295 Lawson Volunteer Center Statewide Initiative 1,806,542
1261 3758 Lawson Wakulla County Courthouse 300,000
1262 1070 Lawson Wakulla Expo 2,000,000
1263 774 Lawson Walulla Springs Aquifer Protection Project 250,000
1264 1621 Lawson Weatherization 5,000,000
1265 1539 Lawson Weems Memorial Hospital Rehab 500,000
1266 2431 Lawson Wesson Multi-Service Senior Center, a Multi-Generational Community 400,000
1267 2033 Lawson Wewahitchka North Gulf County Water Expansion 1,000,000
1268 2031 Lawson Wewahitchka Waste Water Treatment Facility Upgrade 1,500,000
1269 2029 Lawson White City  Water Main Upgrade 2,500,000
1270 2028 Lawson White City Sewer Collection and Transmission 3,500,000
1271 3489 Lawson Whole Child Early Education Pilot 300,000
1272 1165 Lawson Workforce Development at Bristol Youth Academy 200,000
1273 1190 Lawson Youth Sports Afterschool Pilot Project 70,000
1274 2701 Lynn A Healthy Baby 348,250
1275 850 Lynn Augusta Savage Cultural Arts Center 600,000
1276 1965 Lynn Bay Street Stormwater Improvements - Phase 1B 2,000,000
1277 177 Lynn CR 314 Bridge (aka Sharpes Ferry Bridge) Replacement Construction 2,926,000
1278 3289 Lynn Cambridge Basin Home Acquisition 1,000,000
1279 2687 Lynn Cell and Tissue Engineering Initiative 2,000,000
1280 902 Lynn Central Academy Restoration - City of Palatka 3,800,000
1281 2221 Lynn City of Palatka Wastewater Plant 2,000,000
1282 2219 Lynn City of Palatka Water Treatment Plant 2,000,000
1283 559 Lynn Co-Occurring Psychiatric 217,600
1284 3315 Lynn Construction of Fire Station #5 / Community Medical Facility 3,000,000
1285 1139 Lynn Creating Lasting Family Connections - Putnam County Juvenile Diversion/Intervention Program 75,000
1286 4175 Lynn Crescent City Potable Water Line Replacement 500,000
1287 836 Lynn Daytona Beach Shores Sustainable Street Project 80,000
1288 3768 Lynn Disadvantaged Small Communities Grant Program Coll. Facil 750,000
1289 1148 Lynn Drug Awareness of Putnam County 100,000
1290 163 Lynn ELLM-P (Early Language and Literacy Model for Parents) 75,150
1291 842 Lynn East Putnam County Regional Wastewater Project 2,500,000
1292 848 Lynn East Putnam Regional Water Project 2,500,000
1293 557 Lynn Emergency Operations Center 700,000
1294 3585 Lynn Esther Street Property Acquisition for Hazard Mitigation 575,000
1295 2115 Lynn Family Crisis Help Center, Inc. 189,000
1296 332 Lynn Fort King Historic and Cultural Enrichment Park 180,000
1297 1288 Lynn Green Cove Springs Water System Improvements 900,000
1298 3786 Lynn Jefferson Smith Park 200,000
1299 839 Lynn Keystone Heights Business Park Access Road 860,000
1300 838 Lynn Keystone Heights Centralized Wastewater System 1,800,000
1301 835 Lynn Keystone Heights Community Center and EOC 1,009,800
1302 837 Lynn Keystone Heights Street Resurfacing and Paving 850,000
1303 162 Lynn Kimberly's Cottage Children's Campus 306,700
1304 1263 Lynn Legendary Florida 100,000
1305 2048 Lynn Little Haw Creek Master Plan 200,000
1306 590 Lynn Marion County Emergency Operations and Communications Center 3,500,000
1307 1364 Lynn Mathematics, Science, Engineering and Physics Career Path Program 500,000
1308 151 Lynn Methamphetamine Outpatient Treatment 292,500
1309 1450 Lynn Middle and High School Prevention Services for DCF District 12 547,610
1310 1143 Lynn Multi-Purpose Community Activities Facility - Putnam County Fairgrounds 1,400,000
1311 556 Lynn North Indian River Lagoon Conservation Institute 339,400
1312 1485 Lynn North Peninsula Wastewater Collection & Transmission System 5,000,000
1313 543 Lynn Northern Coastal Basin Initiative, FY 2007-2008 3,000,000
1314 574 Lynn Old City Yard 600,000
1315 845 Lynn Paradise Point Wastewater Treatment Facility 1,500,000
1316 844 Lynn Paradise View Potable Water Plant 300,000
1317 1270 Lynn Partnership for Forensic and Jail Diversion 250,000
1318 2051 Lynn Port Buena Vista Wastewater Treatment Facility 1,500,000
1319 1142 Lynn Port Buena Vista Water Plant 3,000,000
1320 1947 Lynn Potable Water River Crossing 750,000
1321 1251 Lynn Public Safety Complex 1,000,000
1322 2060 Lynn Putnam County - Mary Wisham Park Amphitheatre 750,000
1323 843 Lynn Putnam County Comprehensive Master Stormwater Plan Detailed Studies 6,000,000
1324 1147 Lynn Putnam County Courthouse Expansion 2,000,000
1325 840 Lynn Putnam County Crescent City Jr/Sr High School Storm Retrofit 500,000
1326 1146 Lynn Putnam County Emergency Operations Center 500,000
1327 2062 Lynn Putnam County Public Safety, Criminal Justice and Firefighter Training Complex 60,000,000
1328 1149 Lynn Putnam County Sheriff's Work Ethics and Training (SWEAT) Program 75,000
1329 1144 Lynn Putnam County Storm Shelter Retrofits 2,500,000
1330 847 Lynn Putnam County Topographical Contour Mapping (LiDAR) Light Detection and Ranging 1,200,000
1331 1462 Lynn Reed Canal Basin Project 1,000,000
1332 1986 Lynn Reuse Water Plan 2,000,000
1333 2648 Lynn STOP Stroke Initiative 1,000,000
1334 715 Lynn Silver Springs Shores Water, Sewer and Reuse Infrastructure Expansion Feasibility Study 1,500,000
1335 307 Lynn Silver Springs/River Pollution Reduction Project 1,032,369
1336 1256 Lynn Social Services Complex 2,000,000
1337 851 Lynn South Wastewater Treatment Pland Improvements and Sewer Pipe Relining and Replacement 345,000
1338 3353 Lynn Stanaki Preservation Land Acquisition 5,000,000
1339 1399 Lynn The House Next Door Counseling Center 130,000
1340 490 Lynn Thompson Bowl Expansion 1,362,000
1341 1494 Lynn US 1 Reuse Water Line Project 500,000
1342 849 Lynn Upper Etonia Creek Basin/Lake Brooklyn Watershed Study 50,000
1343 891 Lynn Volusia/Flagler Advanced Technology Center Refresh 500,000
1344 2284 Lynn Website Development and Design 25,000
1345 3797 Lynn Welaka Clinic LLC 350,000
1346 2184 Lynn Young Women's Scholastic & Physical Fitness Program 413,237
1347 190 Margolis 172nd. Street Drainage 600,000
1348 428 Margolis 19th World Orchid Conference- Miami 2008 450,000
1349 435 Margolis Anchors Away 100,000
1350 188 Margolis Atlantic  Avenue  Stormwater 328,000
1351 189 Margolis Atlantic Avenue Sanitary Sewer 1,131,000
1352 130 Margolis Aventura  Hospital  District 407,500
1353 3025 Margolis Barrier-free Playground 250,000
1354 2727 Margolis Biomedical Ph.D. Programs 1,450,000
1355 1872 Margolis Carnival Center for the Performing Arts - regional cultural facilities 2,500,000
1356 1116 Margolis Center for Women and Children Program- Environmental Improvement 108,350
1357 191 Margolis Central Island Storm Water Improvements Project 2,000,000
1358 359 Margolis City 2 Sanitary Sewer Pump Station Rehabilitation 1,162,500
1359 362 Margolis City 3 Sanitary Sewer Pump Station Rehabilitation 1,200,000
1360 955 Margolis City of Hollywood Mast Arm Signalization Project 741,067
1361 593 Margolis City of Miami Beach - Water Infrastructure Improvement Plan 7,000,000
1362 603 Margolis City of Miami Beach Stormwater Infrastructure Improvement Project 5,000,000
1363 271 Margolis City of Miami Beach Wastewater Infrastructure Improvement Plan 2,000,000
1364 1923 Margolis City of West Park Comprehensive Plan 150,000
1365 581 Margolis Comprehensive Parkinson's Community-Based Clinic 200,000
1366 369 Margolis Conveyance Improvements to the C-3 Canal East of Control Structure G-93 859,000
1367 587 Margolis Culinary Education and Training for At-Risk Youths (CETARY) Program 400,000
1368 228 Margolis Drug Free Youth In Town (D-FY-IT) 1,000,000
1369 1265 Margolis Economic Development Program 3,000,000
1370 183 Margolis Evidenced-based Practices Training Collaborative 196,163
1371 4108 Margolis Expanding Access to Mental Health Services 242,844
1372 370 Margolis Florida Museum Mentoring Initiative 750,000
1373 355 Margolis Funding for Florida's (11) Regional Planning Councils 3,900,000
1374 1376 Margolis G.A.L. Child Representation Project 892,656
1375 351 Margolis GRAVITY SEWER SYSTEM IMPROVEMENTS 7,500,000
1376 1006 Margolis Green Technology Center 750,000
1377 383 Margolis Haitian Heritage Museum 1,000,000
1378 960 Margolis Highland Village Stormwater and Sanitary Sewer Improvements 3,000,000
1379 1552 Margolis Holocaust Documentation & Education Center Rail Car Preservation Project 200,000
1380 943 Margolis Holocaust Documentation & Education Center Rail Car Site Renovation Project 350,000
1381 1567 Margolis Holocaust Documentation & Education Center Renovation/Preservation Project 350,000
1382 277 Margolis Holocaust Memorial Committee, Inc. 100,000
1383 3193 Margolis Homeless Assessment Referral and Tracking 479,610
1384 270 Margolis INFILTRATION & INFLOW SEWER LINE REHABILATION 125,000
1385 1592 Margolis Illuminated Street Name Sign Program 13,000,000
1386 2288 Margolis Indian Creek Pump Station 1,000,000
1387 184 Margolis Installation of Automated Water Meters 200,000
1388 289 Margolis JCS - Senior Meals Program (Homebound Meals) 600,622
1389 965 Margolis Joe DiMaggio Children's Hospital Meatology/Oncology Program 250,000
1390 1121 Margolis Kristi House Children's Advocacy Center 913,120
1391 1122 Margolis Kristi House Therapy Program Expansion 285,000
1392 1885 Margolis Mental Health Services for Low Income Medicare Recipients 192,000
1393 376 Margolis Miami Beach West Avenue Connector Bridge 6,100,000
1394 1120 Margolis Miami Center for Men- Environmental Improvement  Project 259,200
1395 348 Margolis Miami Children's Hospital Low Income Pool (LIP) Funding 5,750,000
1396 1113 Margolis Miami Medical Clinic 475,000
1397 989 Margolis Miami Shores Village Chipper Field Pollution Remediation Program 500,000
1398 993 Margolis Miami Shores Village Police Car Purchasing Program 450,000
1399 232 Margolis Municipal/Public Safety Building (Phase I) 500,000
1400 1362 Margolis NPF Care Centers of Florida, Inc. 1,046,000
1401 1082 Margolis New World School of the Arts 1,525,707
1402 918 Margolis North Miami Beach Community Center 2,000,000
1403 922 Margolis Northeast 13th Avenue Bridge 650,000
1404 366 Margolis Old Cutler Sanitary Sewer Force Main Replacement 2,500,000
1405 214 Margolis Pembroke Park EOC Equipment 150,000
1406 218 Margolis Pembroke Park Stormwater Improvements 600,000
1407 225 Margolis Pembroke Park Wastewater Improvements 750,000
1408 4141 Margolis Primary Health Care for Indigent Elderly, Adults and Children receiving Mental Health & Substance Abuse Services at MBHC 1,800,000
1409 269 Margolis Public Safety Dockage Facility 45,000
1410 261 Margolis Roadway Improvements/State Road 915 200,000
1411 973 Margolis SFWMD Biscayne Bay Restoration and Enhancement Initiative 2,165,000
1412 1910 Margolis Senior Transportation Program 20,000
1413 2292 Margolis Sewer Rehab Phase I 500,000
1414 585 Margolis South Florida Holocaust Survivors Assistance Program 800,000
1415 180 Margolis Stormwater Injection Well and Culvert Improvements 225,000
1416 230 Margolis Stormwater Project Phase III 400,000
1417 586 Margolis SunPass Implementation 1,500,000
1418 1589 Margolis Sylvester Cancer Research Support 2,500,000
1419 1639 Margolis Taxiway B Reconstruction 584,000
1420 187 Margolis Town of Golden Beach Municipal Complex/Emergency Operation Center 3,000,000
1421 186 Margolis Town of Golden Beach Roadway/Streetscape Improvement 4,000,000
1422 185 Margolis Town of Golden Beach Stormwater Improvements-Portion of Phases 2 & 3 800,000
1423 1614 Margolis Traffic Signal Control-Cabinet Conversion Project 3,500,000
1424 267 Margolis Village of Key Biscayne Sanitary Sewer 2,000,000
1425 266 Margolis WASTEWATER FORCEMAIN  & PUMP REPLACEMENT 750,000
1426 2295 Margolis Watermain Rehab Phase I 300,000
1427 1922 Margolis West Park Law Enforcement and Fire Rescue Assistance 600,000
1428 1921 Margolis West Park SR7/US 441 Stormwater Improvements 1,000,000
1429 1337 Margolis _Belle Meade Storm Sewers Project, Phase II, B-50672 1,400,000
1430 2373 Oelrich Agriculture Training Center 1,250,000
1431 1634 Oelrich Alachua County Fairgrounds Relocation 1,000,000
1432 1963 Oelrich Alachua County Success by Six Program 250,000
1433 1610 Oelrich Archer Clinic Expansion 400,000
1434 508 Oelrich Archer Wastewater Collection System 1,500,000
1435 2074 Oelrich Bradford County Senior Citizen Center / Special Needs Shelter 900,000
1436 388 Oelrich Children's Medical Services Bldg - Gainesville 824,000
1437 405 Oelrich City of Alachua Paul O'Dea Wastewater Treatment Plant (WWTP) Expansion 2,000,000
1438 407 Oelrich City of Alachua Training Center / Burnett's Lake Stormwater Enhancements 1,000,000
1439 412 Oelrich City of Alachua Transportation Enhancements 200,000
1440 506 Oelrich City of Alachua Water System, Fire Protection Enhancement for Southwest Job Center 1,500,000
1441 76 Oelrich City of Fanning Springs Wastewater Project 1,000,000
1442 1821 Oelrich City of Newberry Reclaimed Water System 500,000
1443 1820 Oelrich City of Newberry WWTP Expansion 1,500,000
1444 2087 Oelrich City of Waldo Wastewater treatment improvements 750,000
1445 1972 Oelrich Columbia County Extension Complex 1,595,000
1446 1538 Oelrich Ellisville Wastewater System 1,000,000
1447 2598 Oelrich Florida Agriculture Center and Horse Park Authority 2,000,000
1448 1834 Oelrich Florida High School Activities Association Sportmanship Summit 250,000
1449 165 Oelrich Florida High Tech Corridor Council Program (FHTCC) 3,000,000
1450 57 Oelrich Florida LAKEWATCH 1,000,000
1451 2306 Oelrich Fort  White Branch Library Construction 500,000
1452 744 Oelrich Improvements to Meet Total Maximum Daily Load 2,000,000
1453 909 Oelrich Judicial Emergency Power & Parking 250,000
1454 852 Oelrich Lake City Community College's Gilchrist County Center 2,500,000
1455 63 Oelrich Levy County - Water distribution system restoration 750,000
1456 103 Oelrich Levy County Judicial/Administration Complex 750,000
1457 600 Oelrich Little Hatchett/Lake Forest Creeks Watershed Management Plans 250,000
1458 3709 Oelrich Marion County Sheriff's Office Merces Rottner Sewing and Embroidery Program 50,000
1459 513 Oelrich Orange Creek Basin Initiative, FY 2007-2008 1,500,000
1460 1829 Oelrich Paving - Junction Road  & Centerville Avenue 2,000,000
1461 1623 Oelrich Program of Excellence for Interdisciplinary Research Career Development in Aging 2,300,000
1462 2871 Oelrich Project TRADE- Ocala 200,000
1463 3206 Oelrich Public Safety Emergency Response Training 750,000
1464 3846 Oelrich Recommissioning State-Owned Wood Steam Plant at UCI 500,000
1465 683 Oelrich Regional Groundwater Monitoring Network and Protection of Water Supply 1,500,000
1466 591 Oelrich Regional Justice Crime Prevention Initiative (Reichert) 150,000
1467 912 Oelrich Regional Short-term Residential Treatment 903,000
1468 3300 Oelrich Rodeheaver Boy's Ranch After-School Program 250,000
1469 403 Oelrich San Felasco Conservation Corridor Park FRDAP Application #A08154 112,500
1470 404 Oelrich Santa Fe Hills Subdivision Centralized Water and Server Infrastructure 150,000
1471 104 Oelrich Self Managing Rural Awareness Team (SMART) Diabetes Mgmt Program for Rural Residents 138,123
1472 731 Oelrich Solutions for Water Resource Sustainability 4,776,000
1473 3725 Oelrich St. Johns Avenue Multi-Use Sidewalk/Trail 350,000
1474 846 Oelrich St. Johns River Trailhead Park - Putnam County 1,500,000
1475 2035 Oelrich Starke Fire Department Apparatus Storage Facility 1,000,000
1476 2313 Oelrich Starke Wastewater System Restoration 1,000,000
1477 1849 Oelrich State of Florida Center for Training in the Prevention and Treatment of Childhood Obesity 2,488,215
1478 245 Oelrich Suwannee River Partnership (SRP) Water Quality Based Best Management Practices  (BMP) Planning Implementation & Monitoring 1,000,000
1479 1908 Oelrich Suwannee River Surface Water Improvement Initiative 5,000,000
1480 614 Oelrich Sweetwater Branch/Paynes Prairie Pollutant Treatment Wetland Project 2,000,000
1481 695 Oelrich Traffic Management System 9,100,000
1482 646 Oelrich Tumblin' Creek Wetland Restoration Project 685,000
1483 3010 Oelrich Union County courthouse 100,000
1484 3028 Oelrich Union County records storage facility 100,000
1485 1648 Oelrich University of Florida Medical Student Base Funding Level 9,440,604
1486 3697 Oelrich Upper Ocklawaha River Hurricane Debris Removal 100,000
1487 64 Oelrich Utility Improvements, Route 19 North, City of Chiefland 1,000,000
1488 645 Oelrich Watershed Management Project - Sweetwater Branch and Tributaries 1,000,000
1489 4206 Oelrich Wrigley Fields Improvements 875,000
1490 3271 Peaden A Safe Haven for Newborns 250,000
1491 3054 Peaden Baker Block Museum Heritage Park Expansion 90,000
1492 2138 Peaden Baptist Health Disparities Program 960,000
1493 2450 Peaden Blackman Community Center and Park 150,000
1494 2555 Peaden Bonifay Hospital Sewer Extension 125,000
1495 2556 Peaden Bonifay Hospital Sewer Extension - b 275,000
1496 2392 Peaden Bonifay Wastewater Improvement Program 1,000,000
1497 986 Peaden CR 173 Resurfacing Project 3,623,400
1498 877 Peaden CR 177 Resurfacing Project 3,146,400
1499 3339 Peaden Citrus Health Network, Inc. Adult Crisis Stabilization Unit 500,000
1500 3858 Peaden Citrus Health Network, Inc. Children's Crisis Stabilization Unit 300,000
1501 1543 Peaden City of Chipley Reuse Program 1,000,000
1502 1437 Peaden City of Crestview - Hub City Environmental  Education Center 125,000
1503 1429 Peaden City of Crestview - Industrial Drive Safety Improvements 300,000
1504 1997 Peaden Competency restoration/short-term 2,044,000
1505 3045 Peaden Developmental Disabilities 261,000
1506 2549 Peaden Driftwood Drainage and Stormwater Restoration 1,300,000
1507 562 Peaden East Milton Wastewater Treatment Plant 600,000
1508 1482 Peaden Emergency Generators Rural ALF/RTF 150,000
1509 1408 Peaden Emergency Operations Center Construction Project 300,000
1510 1285 Peaden Escambia River Outward Bound:  Medical Services 81,000
1511 1819 Peaden Escambia River Outward Bound: Mental Health Services 60,000
1512 1271 Peaden Gritney Community Shelter Project 100,000
1513 875 Peaden Holmes County Courthouse Renovations 750,000
1514 1267 Peaden Holmes County Health Department - New Construction 2,600,000
1515 1249 Peaden Holmes County Health Department - Renovations 500,000
1516 1395 Peaden Holmes Fairgrounds Enhancement Project 63,800
1517 4072 Peaden Hurricane Creek Evacuation Shelter/Community Center 350,000
1518 1874 Peaden International Education Expansion 1,000,000
1519 2854 Peaden Jay Historial Society Building 100,000
1520 2084 Peaden Jay Hospital Infrastructure Upgrade Plan 2,000,000
1521 3338 Peaden Magnolia Educational and Recreational Center 60,000
1522 560 Peaden Milton Surface Water Quality Improvements 930,000
1523 1555 Peaden Moor Creek / Mt Carmel Utlities Improvement 500,000
1524 2480 Peaden Morrison Springs Stormwater Restoration and Recreation Project 1,020,000
1525 2782 Peaden Multi-use Community Center Retro-fit for Special Needs and Pet Shelter 10,000,000
1526 3565 Peaden Munson VFD Fire Engine Replacement 250,000
1527 2883 Peaden NE Choctawhatchee Bay Restoration Project - Wastewater 225,000
1528 3798 Peaden NW Florida Emergency Food Distribution Center 1,000,000
1529 2577 Peaden Natural Bridge Recreation Site Acquisition 1,500,000
1530 65 Peaden Okaloosa County, Crestview Government Efficiency Center, Agriculture Facility 750,000
1531 1537 Peaden Okaloosa Public Safety Complex 1,821,000
1532 2286 Peaden Pediatric Dental Residency 280,116
1533 999 Peaden Pittman Community Shelter Project 165,000
1534 1755 Peaden Professionals Resource Network, Inc. 195,000
1535 1468 Peaden Respite Center 450,000
1536 1733 Peaden Sacred Heart Health System 2,500,000
1537 1953 Peaden Santa Rosa County At-Risk Shelter 1,500,000
1538 702 Peaden St. Andrews Bay Surface Water Improvement and Management (SWIM) Program 2,500,000
1539 1384 Peaden State Farmer's Market Renovations 72,000
1540 1662 Peaden Student Loan Repayment Program 1,900,000
1541 1460 Peaden Sybling Emergency Shelter 1,000,000
1542 2842 Peaden Unpaved Stream Crossings in Northwest Florida 1,000,000
1543 2240 Peaden Vernon, Failed Sewer Line Replacement 500,000
1544 2548 Peaden Walton County Health Department Mobile Van 223,019
1545 2504 Peaden Walton County Health Department Replacement Facility 2,856,400
1546 2626 Peaden Walton County Joint Communication Project 3,500,000
1547 588 Peaden Washington County - EMS Station 200,000
1548 1283 Peaden Washington County - Equestrian Facility 1,200,000
1549 1278 Peaden Washington County Courthouse 400,000
1550 2545 Peaden Wastewater Treatment Facility at Mossy Head Industrial Park 4,830,000
1551 1970 Peaden Whiting Aviation/Commerce Park 2,500,000
1552 1335 Peaden Woodbine Road Stormwater Improvements 980,000
1553 2434 Posey A. Max Brewer Bridge Upgrade 3,000,000
1554 752 Posey Agricultural Initiative for SATOP 300,000
1555 4148 Posey Alternative RO Concentrate Disposal Site 1,700,000
1556 3091 Posey B-2 Canal Storage Facility 750,000
1557 473 Posey Brevard County Center Plex Concept 75,000
1558 982 Posey Brevard County emergency operations Center 2,000,000
1559 474 Posey Children's Medical Services Building 2,000,000
1560 2439 Posey Downtown Commuter Rail Station 2,500,000
1561 3092 Posey Downtown Melbourne Retrofit for Treatment Project 750,000
1562 2528 Posey Dual Diagnosis Residential Services 2,113,350
1563 2433 Posey Father Flanagan's Girls and Boys Town of Central Florida 300,000
1564 2863 Posey Florida Air & Space Museum 6,500,000
1565 1870 Posey Florida BioEnergy Commercialization Center 350,000
1566 747 Posey Florida Fleet Biofuels Initative 350,000
1567 3790 Posey Florida Sub-Orbital Commercial Research & Training Center 700,000
1568 2165 Posey Grove Residential Services Enhancement 317,604
1569 2266 Posey Grove Residential Substance Abuse Facilities Expansion 1,540,000
1570 3129 Posey Indian River Lagoon Adventure 375,000
1571 2885 Posey Indian River Lagoon Initiative, FY 2007-2008 18,900,000
1572 3897 Posey Investigation of Hospital-Hotel Partnering for Pandemic Disaster Response 98,000
1573 1119 Posey La Nueva Vida Pregnant Postpartum Women & Infants Program 650,000
1574 3131 Posey Law and Public Safety 50,000
1575 3792 Posey Management, Diagnostics, and Surveillance of Citrus Canker and Citrus 2,000,000
1576 1747 Posey Mobile Testing Initiative 250,000
1577 2601 Posey Mouse Infestation Study 180,000
1578 1748 Posey New Horizons 600,000
1579 981 Posey Non Custododial Parent Work Readiness 200,000
1580 2606 Posey Orange County Central Receiving Center 3,000,000
1581 2436 Posey Orlando Urban Trail 2,000,000
1582 1882 Posey PPWI (Pregnant & Post-partum Women & Children Capital Construction 1,600,000
1583 1827 Posey Palm Bay Parkway 5,000,000
1584 2580 Posey Pedestrian Overpass (Howell Branch Road & State Road 426) 7,000,000
1585 3095 Posey Ray Bullard Water Reclamation Facility (WRF) Expansion Phases III and IV 2,000,000
1586 1565 Posey Riverfront Land Acquisition 3,300,000
1587 916 Posey SOS+ Project (Signs of Suicide) 600,000
1588 4010 Posey School Nurse Program 1,000,000
1589 3209 Posey School Zone Safety Imporvements 280,436
1590 980 Posey School of Architecture startup Florida Institute of Technology 1,000,000
1591 3097 Posey Short-Term Adult Jail Diversion Program 1,850,000
1592 4223 Posey Space Coast Regional Biosolids Dryer 2,500,000
1593 2949 Posey State Road 46 (State Road 415 to US 1) 8,000,000
1594 3791 Posey The Freshman Financial Lab 400,000
1595 4182 Posey The Historic Cocoa Village Playhouse 1,700,000
1596 917 Posey The Village, Transitional Support for Youth Aging out of Foster Care System 206,708
1597 3487 Posey Tom Adams National Training Center for Rowing 3,175,733
1598 729 Posey Working waterways, moorings refurbishment 500,000
1599 3662 Posey Youth Learning and Assessment Center 1,000,000
1600 4067 Posey Zora Neale Hurston Arts & Cultural Museum 400,000
1601 2744 Rich Aging Resource Center Funding 3,300,000
1602 299 Rich Aging Resource Center of Broward County Building 500,000
1603 3907 Rich ArtREACH After School Program for Homeless Children 150,000
1604 462 Rich Austin Hepburn Senior Mini-Center 100,000
1605 2698 Rich Bonaventure Stormwater Improvements 1,000,000
1606 49 Rich Broward County Initiative 15,321,000
1607 2001 Rich C-11 Basin; Everglades Restoration, Aquifer Recharge/Purification & Stormwater Storage Project 1,400,000
1608 1409 Rich Camillus Behavioral Health Treatment Services 1,200,000
1609 1415 Rich Camillus Building 5,000,000
1610 3245 Rich City of Homestead Mayor Roscoe Warren Municipal Park Development 350,000
1611 3246 Rich City of Homestead William F. "Bill" Dickinson Senior Center 750,000
1612 450 Rich Community Nonviolence Project: "Cease Fire" Campaign 300,000
1613 1261 Rich Community Radio Information System/Marketing 100,000
1614 1091 Rich Creating jobs and earnings for unemployed people with disabilities in Broward County 1,000,000
1615 442 Rich Cuban American Bar Association Pro Bono Project 250,000
1616 292 Rich Darrell Gwynn Foundation's Spinal Cord Injury Awareness and Education Program 200,000
1617 831 Rich Developmentally Disabled Safety and Security Project ARC Broward 665,000
1618 1496 Rich Dimensions Family Club 185,000
1619 176 Rich Dori Slosberg Foundation 199,000
1620 1101 Rich EOFHC Electronic Health Records Project 254,860
1621 1088 Rich Emergency Standby Power - City Hall and Police Department Expansion 275,000
1622 1080 Rich Emergency Standby Power - City Regional Wastewaster Plant 230,000
1623 1998 Rich Everglades Restoration, Village Proposed for SW Meadows Sanctuary 350,000
1624 719 Rich Expand Operations of Memory and Wellness Center 200,000
1625 2314 Rich FQHC Provider service Network 500,000
1626 1476 Rich Florida Coordinating Council for the Deaf and Hard of Hearing 400,000
1627 1099 Rich Florida Teach: Math and Science Teacher Program 1,500,000
1628 654 Rich Florida-Israel Institute Budget 290,000
1629 724 Rich HIV/AIDS Program 230,000
1630 458 Rich Help Uplift Broward County (HUB) 950,000
1631 195 Rich Holocaust  Memorial  Committee,  Inc. 100,000
1632 256 Rich Home Instruction for Parents of Preschool Youngsters (HIPPY) 1,900,000
1633 865 Rich Homeless Mental Health and Substance Abuse Project 425,000
1634 1467 Rich Human Services Data and Indicator Analysis 200,000
1635 561 Rich Intergenerational Day Care Center 1,900,000
1636 2208 Rich Jail Diversion Program Gap Funding 500,000
1637 2732 Rich Jeppesen VisionQuest 1,100,000
1638 3746 Rich Kids In Distress, Therapeutic Preschool 100,000
1639 1551 Rich Leeza's Place at Memorial Hospital Pembroke & Memorial Memory Center 500,000
1640 1421 Rich Miami Children's Hospital Pediatric Trauma Program 600,000
1641 2823 Rich Miramar Canal Rehabilitation 300,000
1642 2623 Rich New Parent Information Kit Pilot Project 300,000
1643 2000 Rich New SW Ranches Town Hall; Class-5 Hurricane Protection Upgrading 550,000
1644 1401 Rich Parking Expansion for South Regional Health 1,100,000
1645 3929 Rich Parks System Improvements Project 245,000
1646 1839 Rich Pembroke Pines After School Tutorial Program 250,000
1647 3459 Rich Renacer Seniors Program 150,000
1648 1999 Rich SW Ranches Emergency Response Vehicle 210,000
1649 199 Rich South Broward Drainage District Hurricane Wilma Erosion Project 2,000,000
1650 665 Rich South Florida Holocaust Survivors Assistance Program 800,000
1651 728 Rich Special Needs Children Electronic Medical Records 1,300,000
1652 714 Rich Strategic Missions of Florida Atlantic University 1,080,124
1653 1842 Rich Teen Center 250,000
1654 293 Rich The Reach for the Stars Foundation CF Education Day 100,000
1655 459 Rich The Starting Place 600,000
1656 1628 Rich Transportation Buses 200,000
1657 258 Rich WPPB-TV Becon Funding 750,000
1658 2742 Rich Water and Wastewater Telemetry 900,000
1659 291 Rich Wheelchair Donation Program 250,000
1660 3623 Ring 2 Million Gallon Water Storage Tank 1,000,000
1661 4200 Ring 3.0 Million  Gallon per Day Reverse Osmosis Plant 17,000,000
1662 2678 Ring ARISE Life Management Skills 879,000
1663 1938 Ring Broward Fire Station #109 - Temporary station 313,000
1664 1443 Ring CIP 05-901 Bridge Repair and Maintenance 500,000
1665 1441 Ring Canal Dredging 250,000
1666 1445 Ring Chlorine System Conversion 546,825
1667 4062 Ring City of Lauderhill Broward Estates Park 300,000
1668 4063 Ring City of Lauderhill Holiday Village Water Main Replacement 1,400,000
1669 3981 Ring City of Lauderhill St. George Park Improvements 800,000
1670 3978 Ring City of Lauderhill Tennis Park 5,000,000
1671 4065 Ring City of Lauderhill Water Well Replacement 3,900,000
1672 3980 Ring City of Lauderhill West Ken Lark Park Improvements 2,100,000
1673 1939 Ring City of Parkland - Holmberg Road Fire Hydrants 239,400
1674 1941 Ring City of Parkland - Reconstruction of Trotter's Lane 1,633,000
1675 1397 Ring Coconut Creek Education Corridor 900,000
1676 2587 Ring Community Alert and Warning System 225,600
1677 1442 Ring Community Park Improvements 3,250,000
1678 1434 Ring Construction of Fire Station 103 2,400,000
1679 3236 Ring Developmentally Disabled Safety and Security Project - ARC Broward 665,000
1680 4241 Ring Diversity Sensitivity Training Programs 300,000
1681 1435 Ring EOC Automation Project 138,000
1682 1940 Ring East Holmberg Road Design and Construction 4,320,000
1683 1439 Ring Fire Administration Building (Safety Modification) 567,000
1684 3205 Ring Florida Center for Brain Tumor Research 1,000,000
1685 2585 Ring Increased Fuel Storage and Availability 592,000
1686 3622 Ring Keep Criminals Off the Street 40,000
1687 1433 Ring Lifeguard Tower Replacement 48,455
1688 148 Ring Lyons Road Improvement - Section IV, Copans to Coconut Creek Parkway 550,000
1689 3640 Ring Margate Multi-Use EOC 2,500,000
1690 1438 Ring McNair Center Water Recreation 120,000
1691 1436 Ring Mitchell/Moore Pool 1,800,000
1692 150 Ring Mobile Shooting Range 308,700
1693 4066 Ring New Fire Station 5,000,000
1694 149 Ring New Police Facility 500,000
1695 1448 Ring Pompano Beach Rehab Storm Drain Pipe 200,000
1696 3625 Ring Portable Emergency Generators for Lift Stations 250,000
1697 1444 Ring Rebuild Fire Station 11 1,200,000
1698 1440 Ring Rehab Storm Drain Pipe 300,000
1699 2584 Ring Rescue Unit & Equipment 196,960
1700 1447 Ring Reuse Water Connection Public Outreach 25,000
1701 1935 Ring Riverside Multi-Use Trailways Construction 2,000,000
1702 3629 Ring Security Wall and Camera System 871,000
1703 2586 Ring Tactical Rescue Training Equipment 122,700
1704 2725 Ring Tamarac Stormwater Improvement Project 500,000
1705 2880 Ring Tamarac Youth/Rec Center Project 750,000
1706 3183 Ring Technology Resources Supporting Teaching and Research for FAU 1,000,000
1707 2588 Ring Training Simulator Tower 500,000
1708 1398 Ring Veriplate Automated License Plate Recognition 87,000
1709 1446 Ring Water Treatment Plant Security - Pompano 317,500
1710 3114 Ring nanoscience institute for medical engineering technology (NIMET) at University of FL 6,000,000
1711 246 Saunders Adult CSU Beds 996,450
1712 20 Saunders Alternative Water Resource Development - Integrated Water Management System - ASR Wells 4,000,000
1713 692 Saunders BIlly's Creek Improvements 500,000
1714 6 Saunders Big Cypress Watersheds Initiative 1,000,000
1715 529 Saunders CSU Facility Expansion 1,000,000
1716 19 Saunders Cape Coral North Spreader Waterway Engineering Study 1,000,000
1717 691 Saunders Carrell Canal Water Quality Improvements 500,000
1718 411 Saunders Children's Self Directed Care Pilot Project 263,398
1719 330 Saunders City of Fort Myers East Reclamation Facility 5,000,000
1720 4101 Saunders Coastal Marine Research Partnership Program 250,000
1721 4103 Saunders Comprehensive Marine Biodiversity Inventory 300,000
1722 697 Saunders Downtown Water, Sewer & Stormwater Drainage Improvements 1,500,000
1723 535 Saunders East Winterberry Bridge Replacement 1,000,000
1724 8 Saunders Estero Bay Watershed Initiative 1,902,500
1725 4088 Saunders Graduate Medical Education 10,000,000
1726 1582 Saunders Human Trafficking Statewide Program 250,000
1727 2541 Saunders Islet Cell Transplantation to Cure Diabetes 500,000
1728 4104 Saunders Kilroy: Florida's Marine Conservation Change Agent 350,000
1729 14 Saunders Mulloch Creek Pollutant Loading Reduction Project 300,000
1730 5 Saunders Naples Bay Watershed Initiative 2,000,000
1731 4168 Saunders Relocation of UF/IFAS Field Operations 7,448,000
1732 2747 Saunders Southwest Florida Holocaust Education and Teacher Training Initiative 100,000
1733 17 Saunders State Road 78 (Pine Island Road) Four-Laning 5,000,000
1734 18 Saunders State Road 78 Corridor Improvements 10,000,000
1735 16 Saunders State Road 78 Stormwater Retention System 10,000,000
1736 11 Saunders Tamiami Trail Hydrologic Improvements Part I (Tamiami Trail Culverts 4,500,000
1737 10 Saunders Tamiami Trail Hydrologic Improvements Part II (S-12 Structures) 3,000,000
1738 2543 Saunders Ventilator Dependent Rehabilitation 726,000
1739 1110 Saunders World-Class Oral Health Program for Children in Collier County 800,000
1740 2374 Siplin "Each One, Reach One, Teach One" Initiative 155,000
1741 4147 Siplin "Keeping Up" Alternative School Suspension Program 100,000
1742 3848 Siplin "Youth Central" Reading Initiative - Mentoring - Drug & Alcohol Awareness & Truancy Intervention 350,000
1743 2329 Siplin African American History Marketing and Educational Initiative 200,000
1744 4079 Siplin African American Male Summit 250,000
1745 4085 Siplin Alliance Small Business Recovery Program 200,000
1746 3850 Siplin Central Florida ACORN Institute Financial Justice Center 50,000
1747 3274 Siplin Community Humanitarian Services 475,600
1748 2333 Siplin Hebni's Nutrition Resource Center 250,000
1749 3985 Siplin Professional Opportunity Program 1,000,000
1750 2331 Siplin Rio Grande Charter School of Excellence Reading 500,000
1751 4069 Siplin Where You At? 88,650
1752 3198 Storms Equipment for Expansion 10,000
1753 54 Storms Everglades IMAX Movie 4,000,000
1754 2140 Storms Kids Charity of Tampa Bay Emergency Assessment Shelter 2,500,000
1755 3125 Storms Memory Screening Tool 300,000
1756 1837 Storms Plant City Eastside Canal Stormwater Management Master Plan 2,000,000
1757 1836 Storms Sydney Road Reclaimed Water Distribution System, Phase 1 & 2 2,000,000
1758 1838 Storms Trapnell/Mud Lake Road Looped Waterline Extension 625,000
1759 1835 Storms Urban Forest Park Phase 1 Development 250,000
1760 2591 Villalobos 2007 NCLR Annual Conference 75,000
1761 2550 Villalobos Applied Behavior Analysis Therapy 400,000
1762 2446 Villalobos Camp Matecumbe Building Renovations 2,431,000
1763 2537 Villalobos Elderly Services Program 400,000
1764 2276 Villalobos Fragile X - Newborn Screening Pilot Program 500,000
1765 2761 Villalobos Health Care for Indigent Adults and Children 675,000
1766 2791 Villalobos Jay Weiss Pilot Program to Address Health Disparities in Overtown 750,000
1767 2624 Villalobos Miami River Commission 250,000
1768 2551 Villalobos Southwest Social Services 3,000,000
1769 2553 Villalobos Spinal Cord and Traumatic Brain Injury Research 1,650,000
1770 2621 Villalobos The Family, School & Friends Promotion & Prevention Program 250,000
1771 2155 Villalobos Tutorial Education Recreation Program (TERP) 300,000
1772 2388 Villalobos Village In-Home Services Program 262,500
1773 1721 Webster 100 Bed Post Transitional Housing 730,000
1774 1294 Webster Forensic Recovery Enhancement Team (FRET) 483,591
1775 198 Webster Hispanic Business Iniative Fund Statewide Outreach Program 600,000
1776 2524 Webster Howard Phillips Center for Children and Families 350,000
1777 1618 Webster Orange Blossom Trail Corridor Stormwater Improvements Project 650,000
1778 2534 Webster Primrose Center Capital Improvements 729,700
1779 352 Wilson 5000 Role Models of Excellence Project Expansion 800,000
1780 3358 Wilson ADE - Construction funds for Center for Adults with Developmental Disabilities 1,000,000
1781 3333 Wilson ADE Services for Adults with Developmental Disabilities 200,000
1782 160 Wilson AIDS Insurance Continuation Program (AICP)    RETENTION 1,300,000
1783 2382 Wilson Abstinence Education Program 200,000
1784 3710 Wilson After School Program 250,000
1785 25 Wilson After School and Summer Enrichment - NHDC 50,000
1786 419 Wilson Alternatives to Incarceration (ATI) 700,000
1787 72 Wilson Alzheimer Multicultural Outreach-Statewide- (Alzheimer'¦s REACHOUT Florida ) 540,000
1788 807 Wilson Associated General Contractors (AGC) Job Training and Placement Program 240,210
1789 4064 Wilson Association of Florida Children's Hospitals Multi-site Medical Home Demo 162,000
1790 3574 Wilson Barry University Accelerated Bachelors of Nursing Program 550,000
1791 2352 Wilson Barry University Center for Community Health and Minority Medicine 2,000,000
1792 3576 Wilson Barry University Teacher Certification and Retention of Minority Teachers for At Risk Students Pilot 600,000
1793 418 Wilson Brain & Spinal Cord HCB Waiver - Increase in Supplies and Presciption funding 900,000
1794 94 Wilson Change the Culture - Victims Services Center 600,000
1795 309 Wilson City of Miami Gardens  NW 167-175 St/NW 11-17 Ave Drainage Improvements 307,500
1796 311 Wilson City of Miami Gardens NW 153-155 St/NW 14-17 Ave Drainage Improvements 200,000
1797 313 Wilson City of Miami Gardens NW 179 Street/NW 32 Ave-NW 35 Court Drainage Improvements 112,500
1798 314 Wilson City of Miami Gardens NW 191 Street Between NW 10-11 Court Drainage Improvements 162,500
1799 316 Wilson City of Miami Gardens NW 194 Terrace-NW 196 Street/NW 21 Avenue  Drainage Improvements 175,000
1800 2283 Wilson City of Miami Wagner Creek/Seybold Canal Dredging 12,000,000
1801 2301 Wilson Community Access Program of Miami-Dade County Florida (CAP) 585,969
1802 28 Wilson Community Activities and Nutrition Center 200,000
1803 3891 Wilson Comprehensive Parkinson's Community-Based Clinic 200,000
1804 1030 Wilson Comprehensive Primary Health Care for NANAY, Inc. 707,840
1805 3277 Wilson Concepttual Learning:  Successful Learning (CLSL) 350,000
1806 2312 Wilson Construction Funds for ADE-Center for Adults with Developmental Disabilities 1,000,000
1807 2384 Wilson Creole Literacy Program 250,000
1808 2300 Wilson EOFHC  James E. Scott Health Center Project 1,250,000
1809 69 Wilson EOFHC Health Center Office Park 2,500,000
1810 23 Wilson EOFHC James E. Scott Health Center Project 1,250,000
1811 56 Wilson EOFHC Jefferson Reaves Women's Residential Facility Revitalization Project 250,000
1812 22 Wilson EOFHC Jessie Trice Center for Community Health Project 500,000
1813 2233 Wilson El Portal Drainage Improvements Project 750,000
1814 3035 Wilson El Portal Seawall/Canal Bank Stabilization 675,000
1815 2296 Wilson Elderly Community Activities and Nutrition Center 50,000
1816 100 Wilson Emergency Generators: Raw Water Wells & Sanitary Lift Stations - North Miami 2,028,750
1817 3285 Wilson Emergency Operations & Energy Center 2,000,000
1818 2304 Wilson FANM SPECIAL PROJECTS 2007 2,000,000
1819 2110 Wilson Foster Care Review 800,000
1820 102 Wilson Gravity Sewer System Improvements - North Miami 7,500,000
1821 317 Wilson HIV/STD Jail Screening and Linkage Project 500,000
1822 482 Wilson Haitian American Association Against Cancer, Inc.'s (HAAAC) Comprehensive Outreach, and Screening Cancer Program 200,000
1823 3356 Wilson Haitian American History and Awareness Project 200,000
1824 2302 Wilson Haitian Community Planning Council of Florida 1,500,000
1825 71 Wilson Haitian Heritage Museum 1,000,000
1826 4 Wilson HealthConnect  in Our Schools 2,200,000
1827 1 Wilson Home Care Services to Frail Elderly Individuals 124,800
1828 813 Wilson Hope Relief Emergency Assistance 1,000,000
1829 772 Wilson Inner City Youth S.F/ Project Hope 250,000
1830 4021 Wilson Intergenerational Health and wellness education and promotion 500,000
1831 782 Wilson JESCA ELDERLY TRANSPORTATION 150,000
1832 783 Wilson JESCA Early Childhood Development 150,000
1833 786 Wilson JESCA FLOYD YOUTH INTERNSHIP PROGRAM 200,000
1834 785 Wilson JESCA NORTH SHORE COMMUNITY CENTER 700,000
1835 787 Wilson JESCA Young Girls 2 Young Ladies Program 200,000
1836 1742 Wilson JESCA's Teenage AIDS and Pregnancy Prevention Program 250,000
1837 781 Wilson JESCA-Transition and Stabilization 200,000
1838 67 Wilson Jail Diversion: - Assertive Community Team 500,000
1839 565 Wilson Jessie Trice Cancer Prevention Project 681,571
1840 3178 Wilson Jessie Trice Community Nursing Program 300,000
1841 2303 Wilson Job Training & Development Youth Outreach Activity Center 300,000
1842 1873 Wilson Labor in Love 100,000
1843 3371 Wilson Little Haiti & North Miami Intel Computer Clubhouse 20,000
1844 171 Wilson Local Health Planning Councils 1,200,000
1845 2 Wilson Make Your Heart Healthy Free Screening Program 100,000
1846 1588 Wilson Miami-Dade County Health Department Main Complex Replacement 10,774,000
1847 3305 Wilson Miami-Dade Department of Human Services Expand Respite Services for Homebound Elderly Receiving In-Home Services 655,890
1848 634 Wilson New Horizon Family Preservation and Support Program 300,000
1849 633 Wilson New Horizon's Children and Family Center 350,000
1850 635 Wilson New Horizon's Dual Diagnosis Residential Program 600,000
1851 632 Wilson New Horizons Mental Health and Substance Abuse Program for Youth Under the Age of 18 250,000
1852 394 Wilson Opa-locka  Cairo Lane Stormwater Drainage Improvements 1,925,000
1853 395 Wilson Opa-locka  Water Booster Station Repair and Upgrade 1,400,000
1854 396 Wilson Opa-locka 38th Ave  Stormwater Drainage and Roadway Improvements 925,000
1855 398 Wilson Opa-locka Citywide Sidewalk Repair & Rehabilitation 300,000
1856 399 Wilson Opa-locka NW 139th Street Drainage System Improvements 73,000
1857 400 Wilson Opa-locka NW 143rd Street Stormwater Drainage Improvements 560,000
1858 809 Wilson Opa-locka Police Department  Livescan Fingerprinting System 20,000
1859 808 Wilson Opa-locka Police Department Gunshot Detection System 360,000
1860 3719 Wilson Osun's Village and The African, Caribbean Cultural Arts Corridor -A Cultural Heritage, Tourism  & International Trade Destination 5,000,000
1861 770 Wilson Overtown Affordable Rental Housing 125,000
1862 3067 Wilson Personal Escape Equipment 1,000,000
1863 116 Wilson Rebuilding Together Miami 250,000
1864 111 Wilson SANITARY SEWER FORCE MAIN IMPROVEMENTS  - North Miami 1,000,000
1865 623 Wilson Sant La One Stop Neighborhood Resource Center 50,000
1866 2309 Wilson Services for Adults with Developmental Disabilities at  ADE 200,000
1867 99 Wilson St. Thomas University Science & Technology Building 6,000,000
1868 4256 Wilson Statewide Service-Learning Pilot Project 1,300,000
1869 95 Wilson Stress Reduction for Health - Victim Services Center 280,000
1870 3258 Wilson Technology Enhancements 700,000
1871 1031 Wilson Unite for Peace- Miami (City of Miami) 500,000
1872 3203 Wilson Urban Minority Teacher Education Program 389,000
1873 1032 Wilson Youth Coop Employment Assistance Center 300,000
1874 387 Wilson Zo's Summer Groove 250,000
1875 89 Wise "Leave No Teacher Behind", Teacher Certification and Professional Development Program 3,540,000
1876 2167 Wise Advancing Careers in Education Teacher Cadet Program 200,000
1877 3485 Wise Assessment Center for Abused, Neglected and Abandoned Children 150,000
1878 1405 Wise Autism Respite 494,119
1879 114 Wise Callahan Wastewater Treatment Plant Improvements 2,000,000
1880 2170 Wise Capital Outlay/Regional Consortia 2,000,000
1881 2171 Wise Career Pathways Academy 20,000,000
1882 3099 Wise Children's Medical Services Early Cleft Palate Program 200,000
1883 3101 Wise Children's Medical Services Early Intervention Program 4,600,000
1884 3100 Wise Children's Medical Services Expense 623,000
1885 3102 Wise Children's Medical Services Primary Care 2,600,000
1886 519 Wise Children's Mental Health 330,000
1887 1655 Wise Chronic Substance Abuse/Mental Illness Misdemeanor Treatment Services 500,000
1888 3888 Wise Clapboard Fish Camp 3,500,000
1889 970 Wise Clarke House Museum 20,000
1890 524 Wise Clay & Baker Kids Net 510,000
1891 306 Wise Communities In Schools (CIS) - In Jail Program 90,000
1892 4285 Wise Community Advisory Panel on Foster Care Pilot Program 300,000
1893 2650 Wise Community Training Works 600,000
1894 2172 Wise Dropout Prevention/Credit Recovery Program 1,000,000
1895 856 Wise Early Delinquency Intervention Program (EDIP) 820,155
1896 3785 Wise Elder Mental Health Services 300,000
1897 300 Wise Employee Match Program 100,000
1898 447 Wise Enhanced Child Protection Teams Funding 4,000,000
1899 2463 Wise Expanding Dental Education Opportunities on the UF-Jacksonville Campus 2,350,000
1900 827 Wise Fast For Word: A Local Model for Alternative Education Reform 462,189
1901 3820 Wise Fish for Life, Inc. 300,000
1902 834 Wise Florida Adoption Information Center 180,400
1903 2174 Wise Florida Reading Initiative/Just Read, Florida! 2,500,000
1904 2178 Wise Florida SUMS (Students Using Math and Science) 1,400,000
1905 4255 Wise Florida Shrimp Processing Plant 10,000,000
1906 2179 Wise Florida Sportsmanship Initiative 500,000
1907 3279 Wise Funding for Florida's Three Women's Business Centers 225,000
1908 274 Wise Gateway Connect (formerly 1-800-Wait Not) 750,000
1909 1653 Wise HIV AIDS Support Services 1,000,000
1910 479 Wise High Crime Neighborhood Juvenile Delinquency Prevention Initiative 1,550,000
1911 2695 Wise Homeless Housing & Supportive Services 1,000,000
1912 301 Wise Hubbard House - In Jail Anger Management Program 15,000
1913 1325 Wise Inside/Outside Expanded Residential Project 500,000
1914 1714 Wise Inside/Outside House Inc. 175,000
1915 255 Wise Jacksonville Mentoring Project 100,000
1916 87 Wise JaxHATS Transition Program 600,000
1917 857 Wise Juvenile Assessment Center 3,500,000
1918 476 Wise Juvenile Delinquency Diversionary Neighborhood Accountability Boards Initiative 1,550,000
1919 4073 Wise Levi Shannon,Jr. Memorial Park 50,000
1920 1413 Wise Life Skills Program 35,000
1921 304 Wise Living Inside Project 25,000
1922 182 Wise Mental Health Cooperative 100,000
1923 1756 Wise Mental Health Court 400,000
1924 1427 Wise Mental Health Services for Youthful Offenders 50,000
1925 2766 Wise Mental Health Training Center 300,000
1926 3628 Wise Mentor A Kid for Excellence (M.A.K.E.) 150,000
1927 2175 Wise Mentoring Initiative for Rural Districts 250,000
1928 536 Wise Mobile Crisis 400,000
1929 1855 Wise Nassau County Sheriff's Administration/911 Dispatch Communications Center 9,000,000
1930 3580 Wise New Well Site - Town of Callahan 1,000,000
1931 3103 Wise North Lake Septic Tank Phase Out Project 2,562,000
1932 2836 Wise OCALA ADULT OUTPATIENT TREATMENT PROGRAM 300,000
1933 2857 Wise OFFENDER WORK TRAINING PROGRAM 300,000
1934 2826 Wise PHOENIX HOUSE RESIDENTIAL TREATMENT 700,000
1935 1979 Wise Planning Funds for FSU College of Criminology and Criminal Justice Building 1,500,000
1936 2177 Wise Principal Leadership Academy 750,000
1937 75 Wise Project Independence 500,000
1938 85 Wise Project Reconnect/The Habitual Misdemeanor Offender Program 500,000
1939 51 Wise RDI Consultant for Clay County Schools (Pilot) 100,000
1940 555 Wise ROAR (Recognition, Outreach, Advocacy, Resolution) 100,000
1941 4028 Wise Railroad Quit Zone 500,000
1942 265 Wise Risk Avoidance Education for NEFEC Teachers, Students and Parents 430,956
1943 3881 Wise Sewer System Rehabilitation 150,000
1944 743 Wise Special Olympics Florida Athlete Health, Wellness and Empowerment Initiative 550,000
1945 735 Wise Statewide Pediatric Cardiology Center Funding 600,000
1946 863 Wise Stonesoup School 1,500,000
1947 622 Wise System of Care for Children with Fetal Alcohol Spectrum Disorder (FASD) 250,000
1948 1812 Wise TFTJ Learning Center 500,000
1949 3105 Wise The Life Enrichment Initiative: A campaign for Pine Castle 500,000
1950 3726 Wise Therapeutic Home: Reducing Institutionalization for Elders 400,000
1951 3692 Wise Town of Penney Farms Town Hall 1,500,000
1952 3694 Wise Town of Penney Farms Wastewater Extension and Stormwater Upgrade 1,000,000
1953 3691 Wise Town of Penney Farms Wastewater Treatment Facility 1,500,000
1954 294 Wise Turning Point Program - UF/Shands Hospital 33,000
1955 170 Wise University of North Florida Students in Free Enterprise (UNFSIFE) 36,450
1956 329 Wise Visual Art Elementary Assessment Project 150,000
1957 73 Wise Wellness Center 48,786
1958 2185 Wise William Burgess Road Extension 4,644,443
1959 1626 Wise Williamson Creek Restoration 520,000